Cambridge Civic Journal Forum

December 31, 2013

K2C2 Final Reports Released

Filed under: Cambridge,Central Square,Kendall Square,planning — Tags: , , — Robert Winters @ 10:58 am

K2C2 Final Reports Released

K2C2 areaThe final reports for Kendall Square and Central Square are now available for download. Zoning discussions based on the recommendations of the K2 and C2 Advisory Committees, which are encapsulated in these reports, will continue in 2014.

Community Development Department

Kendall Square Central Square Planning Study (K2C2)

Central Square Final Report 2013 Part 1, December 2013

Central Square Final Report 2013 Part 2, December 2013

Kendall Square Final Report 2013 Part 1, December 2013

Kendall Square Final Report 2013 Part 2, December 2013

This comprehensive planning effort guided by stakeholder advisory committees, City staff, and a team of multidisciplinary consultants led by Goody Clancy, developed a vision and master plan for Central Square, Kendall Square, and the area South of Main Street (including the Osborn Triangle) connecting the two squares. Both final reports are divided into two parts; in each case you will need to review both parts to read the entire report.

December 9, 2013

FaTeague – Dec 9, 2013 Cambridge City Council Agenda

Filed under: Cambridge,City Council,Kendall Square — Tags: , — Robert Winters @ 12:21 pm

FaTeague – Dec 9, 2013 Cambridge City Council Agenda

There are basically two noteworthy items on this week’s agenda and both of them relate to Kendall Square. The first is the Ames Street Land Disposition. There’s a public hearing at 6:30pm on the proposal by the City of Cambridge to sell a 20-foot wide strip of public land along the eastern edge of Ames Street between Main Street and Broadway in Kendall Square. The land would be sold to a private owner with the condition that it would be combined with adjacent land to enable the construction of a residential building with ground floor retail. The public hearing is being held pursuant to the requirements of Section 2.110.010 of the Cambridge Municipal Code, regarding Disposition of City Property. [text from the call of the meeting]

The Cambridge Revelopment Authority (CRA) supports the plan as does the Planning Board as indicated in:

City Manager’s Agenda #3. Transmitting communication from Richard C. Rossi, City Manager, relative to a Planning Board recommendation supporting the proposed Ames Street Land Disposition.

Date: Dec 3, 2013
Subject: Ames Street Land Disposition
Recommendation: The Planning Board supports the proposed disposition.

To the Honorable, the City Council,

The Planning Board recommends that the land disposition proceed in accordance with the terms outlined in the City Manager’s Nov 18, 2013 report, the attached Request for Proposals and the winning proposal submitted by Boston Properties Limited Partnership.

The Board finds that the report adequately and correctly summarizes all of the considerations with regard to the land disposition. The proposal has many significant benefits to the City, including the addition of new housing to Kendall Square and the activation of the streetscape with ground-floor retail and small open spaces on Ames Street. The financial arrangements will also benefit the City, as the report indicates that the price offered for the Property is within the range of the City’s independent appraisals, that the buyer will also assume responsibility for public roadway improvements associated with the project, and that the project will generate ongoing tax revenue for the City. The report also indicates some potential drawbacks of the proposed project, such as shadow impacts, which will be assessed by the Planning Board as part of its project review requirements.

Taking into account all considerations with regard to this disposition, the Planning Board finds that it is an appropriate action to be taken by the City.

Respectfully submitted for the Planning Board,
Hugh Russell, Chair

Most reasonable people, including most or all of the city councillors, will likely agree with the assessment of the Planning Board. Nonetheless, the hearing is likely to bring out those who continue to object to last year’s approval of the downsizing of a rooftop garden in exchange for a greatly extended time during which it will be maintained for public access (an additional 28 years). Some will likely testify that this is some kind of scandalous giveaway to big, bad corporations. Others will argue that the City should somehow try to leverage the delivery of All That Is Good in exchange for this unimportant strip of the public way. This is nothing but bad political theater.

Communication #3. A communication was received from Charles Teague, 23 Edmunds Street transmitting his reply to Cambridge City Council response on Open Meeting Law Complaint dated Nov 5, 2013.

Carlone AccusesSpeaking of bad political theater, the meaningless saga continues of the unhappy activist filing Open Meeting Law complaints when votes don’t go his way. This week’s agenda brings a tedious 76 page communication from Charles Teague, the new right-hand-man of Councillor-Elect Dennis "Pearl Harbor" Carlone. The thought that this kind of pointless harassment may become the norm for the new City Council is enough to drive away even long-term Council-watchers like me. Is this what civic activism has degenerated into? Will every significant City Council vote now be subject to complaints filed with state agencies?

In baseball, when the 3rd out is registered in the bottom of the 9th, you accept your loss and head for the locker room. You don’t file a protest with the Baseball Commissioner. The antics of Teague and company are the civic equivalent of bad sportsmanship, and this may soon become the norm.

You can never predict how an idiotic complaint like this will ultimately turn out, but the incident that was the subject of the complaint is simple to describe:

(a) MIT filed several iterations of a zoning petition for an area in and around Kendall Square where MIT owns a significant amount of property. The petition went through many public hearings before finally coming to a vote on Apr 8, 2013.

(b) During the weeks and months leading up to ordination, MIT representatives met with all of the city councillors and developed a memorandum of understanding that included substantial commitments.

(c) Prior to final ordination on the night of the vote, a series of amendments were proposed by several councillors. Councillor Kelley objected strenuously to the late arrival of the proposed amendments. There were so many opportunities to propose amendments during the months, weeks, and days leading to this vote, that there was no excuse for trying to rush these amendments through.

  One such proposed amendment by Councillor vanBeuzekom would have required "net zero" energy standards on any new buildings. This enjoyed a temporary victory on a 5-3-1 vote with Councillors Cheung, Decker, Simmons, vanBeuzekom, and Mayor Davis voting YES; Councillors Kelley, Maher, and Toomey voting NO; and Councillor Reeves voting PRESENT. This led to very clear expressions from MIT representatives that such a requirement would invalidate the commitments to which they had previously agreed. This was communicated to Councillor Maher and through him to Mayor Davis. When informed that this burden could threaten MIT’s other commitments, Mayor Davis reluctantly asked to change her vote from YES to PRESENT which defeated the amendment 4-3-2. This was a vote change that Mayor Davis clearly did not relish, but she did it for the greater goal of passing the entire package. All of this took place in full view of the public.

(d) The MIT/Kendall zoning petition was then ordained on a 7-1-1 vote with Councillor vanBeuzekom voting NO (as expected) and Vice Mayor Simmons voting PRESENT. The revised Letter of Commitment from MIT was approved unanimously.

There was NOTHING unusual in what transpired that evening. However, a photograph of MIT representatives explaining their position to Councillor Maher was used to claim that some sort of shenanigans had taken place. This led to a complaint being filed long after the period for such complaints had expired. The City Clerk and City Solicitor drafted a response that was approved by the City Council, and we now get this 76 page followup from the disgruntled political activist.

Many people have noted that the current City Council has at times engaged in pointless interpersonal bickering, and this is fair criticism. However, unless some of the newly elected councillors and the incumbent councillors take some affirmative action early in the 2014-15 term to set a good tone, we may find ourselves looking back longingly toward the relative peace and harmony of the 2012-13 City Council. – Robert Winters

June 8, 2013

Kendall Square Urban Renewal Project: Six Pivotal Episodes

Kendall Square Urban Renewal Project: Six Pivotal Episodes

By Thad Tercyak, Cambridge Redevelopment Authority, Associate Director, 1968-1990

In 2012, the Cambridge Civic Journal published "Kendall Square Urban Renewal Project: Initial Years, 1963 to 1982". The following commentary focuses on six pivotal episodes during the 1963-1982 time period which provided the impetus for major development in the Kendall Square Urban Renewal Project. Successful development of the Kendall Square Project was a major factor in helping to attract high-tech companies to locate in the eastern sector of the City of Cambridge. Today there are over 163 institutional research companies within a 1-mile radius of the Kendall Square Urban Renewal Project area (Source: Boston Consulting Group, Capital IQ DB, U.S. Census Bureau, National Science Foundation.)

The episodes are described in chronological order.

1. Conceptualization and initiation of the Kendall Square Urban Renewal Project

In 1963, Mr. Robert F. Rowland, a city planner with extensive urban redevelopment experience, commuted to his job with the Boston Redevelopment Authority (BRA), parking his car in the Massachusetts Bay Transportation Authority (MBTA) Kendall Square rapid transit station parking lot. He noticed the area north of the rapid transit station was severely underdeveloped and an urban blight with underutilized, largely vacant and obsolete industrial and warehouse buildings. Because of the extent of urban blight, there did not appear to be any prospects for private development there. As a city planner, he visualized the land as an ideal site for urban redevelopment because of its unique locational advantages, including the rapid transit station, proximity to the Massachusetts Institute of Technology (MIT), direct subway connections to Harvard and downtown Boston, and easy connection to Logan Airport.

Rowland was aware President John F. Kennedy had assigned the task of sending an American astronaut safely to and from the Moon before the end of the decade to the National Aeronautics and Space Administration (NASA) which was searching for a site in the Boston area for development of its Electronic Research Center.

On their own time, Rowland and two associates sketched out a redevelopment plan for the Kendall Square area which would accommodate NASA and provide land for NASA-related private development. He presented his concept plan to the Cambridge Redevelopment Authority (CRA) which asked him to work with the CRA to move the plan through the redevelopment process. Rowland agreed, left his job with the BRA, was hired by the CRA and in 1964 was appointed CRA Executive Director.

In 1964, the CRA presented the concept plan to the Cambridge City Council. The Council voted to have the CRA prepare a redevelopment plan for the Kendall Square area with two objectives: (1) to provide land for both NASA and private development which would generate needed tax revenues for the City of Cambridge and employment opportunities; and (2) to secure maximum federal funds to help alleviate concerns about Cambridge’s ability to finance its share of the cost to carry out the project.

With respect to the first objective, the City of Cambridge, with support from local and congressional representatives, convinced NASA officials of the advantages of a Kendall Square location. After discussions and consultations among the CRA, NASA, Cambridge representatives and the U.S. Department of Housing and Urban Development (HUD), it was determined that development could be expedited by using the urban renewal process.

2. Financing Cambridge’s $6.5-million share of the project cost

With respect to the second objective, the CRA advised Cambridge officials to take advantage of a complex urban renewal financing formula which could be used to "secure maximum federal funds" to finance Cambridge’s share of the cost to carry out the project.. The formula, based on Section 112 of the Housing Act of 1949, provided that expenditures by educational institutions and hospitals on facilities located within a mile of an urban renewal project that contributed to the objectives of the urban renewal project can be used as credits ("Section 112 credits") to cover the local share of the project cost.

The CRA took the lead in coordinating the efforts of Cambridge, MIT officials and congressional representatives to work out the details required to secure federal approval of the Section 112 credits financing plan. The City and MIT entered into an agreement which provided that MIT prepare a Development Plan which included MIT property located within a mile of the redevelopment area to be used for educational purposes. After the City’s review and approval of the plan, the expenditures incurred by MIT to acquire land and construct buildings in accordance with the plan could be used as Section 112 credits. Subsequently, when the Kendall Square Urban Renewal Project was approved, MIT provided $6.5-million dollars in Section 112 credits to cover the City of Cambridge’s entire share of the project cost.

3. NASA Quits. CRA amends Kendall Square redevelopment plan and objectives

The original Kendall Square Urban Renewal Plan covered 43 acres of land and designated 29 acres for use by NASA and 14 acres for NASA-related private development. The initial four years of the project were executed expeditiously. The CRA transferred 19 acres of vacant land to NASA for construction of a 14-story office tower and five low-rise buildings, and prepared an additional 10 acres of vacant land for future development by NASA. In 1970, without warning, NASA decided to abandon its operations in the project. It indicated it did not need the 10-acre site of vacant land designated for its development, and was transferring its interests in the project to the U.S. Department of Transportation (DOT). DOT established the National Transportation System Center on the site formerly occupied by NASA and named it after John A. Volpe, Secretary of DOT and former governor of Massachusetts

Cognizant that the 10-acre site originally designated for NASA’s use under the terms of the original Kendall square Urban Renewal Plan was still undeveloped and in CRA possession, the CRA recognized an opportunity to expand the area of land which could be developed for private uses which would benefit Cambridge more than if the land was developed by the federal government. The CRA decided to amend the Kendall Square Plan to designate new reuses for the undeveloped land even though that meant starting again the complicated and time consuming process of preparing a second Kendall Square Plan.

The CRA commenced negotiations with DOT Secretary Volpe, making the case that DOT should relinquish its rights to Parcel 2 because NASA’s withdrawal from the project was a breach of its contractual obligation with the CRA; a flagrant disregard of its commitment to the community; and had undermined the City’s program to market the project area for private development. After 2 years of prolonged negotiations among the CRA, DOT, U.S. General Services Administration, and HUD, Secretary Volpe released DOT’s rights to Parcel 2 to the CRA.

When NASA decided to withdraw from the Kendall Square area, the feeling in the City of Cambridge was that the project had been delivered a tremendous setback because it had lost its major developer. As it turned out, despite the years of development delays caused by NASA’s the withdrawal, it was a blessing in disguise because the additional 10-acres of land plus the 14 acres already designated for private development became a 24-acre site large enough to create a critical mass for high-tech development in the Kendall Square Project which eventually helped to attract additional high-tech development in the eastern sector of Cambridge.

4. Urban Land Institute Advisory Services engaged to help break planning deadlock.

Cambridge was unprepared for carrying out the difficult and complicated tasks involved in overhauling the original plan and replacing it with an entirely new plan. Cambridge City Council created a task force comprised of representatives from a cross-section of Cambridge organizations and the Cambridge Planning Department to work with the CRA in the re-planning effort. A number of plans were developed, including proposals with contradictory project objectives, including "quick-fix" land uses, such as a beer distribution warehouse, a soccer field, open space, even restoring the Broad Canal, but the City could not arrive at a consensus.

Over time, a cloud descended over the project’s development potential and grumbles concerning the apparent lack of progress in redeveloping the site began to be heard, even mockery about changing the name of Kendall Square to "Nowhere Square".

To help break the planning deadlock, the CRA retained the advisory panel services of the Urban Land Institute (ULI) to review the Kendall Square Project and propose ways to move the project in the right direction. In carrying out the assignment for the CRA, panel members first spent two days reviewing comprehensive briefing materials prepared by the CRA staff and touring the project and surrounding area. Then individual panelists and teams conferred with nearly 100 community spokespersons, citizens, business persons, government officials, members of the local real estate community, and others interested and concerned with the future revitalization of the Kendall Square area.

The ULI panel concluded that only a few properties in the country had a broader array of locational advantages as the Kendall Square area and the opportunities associated with the Kendall Square Urban Renewal Project: "Cambridge Center is a unique opportunity area, one that should be reserved to maximize its locational advantages". The ULI panel presented a point of view that the Kendall Square Project was a valuable asset that has the potential to produce great benefits to the City of Cambridge; and that the CRA and Cambridge City Council should resist the impulse to dispose of the land to take advantage of its short term marketability in response to concerns being expressed about development delays. The panel urged the CRA and City to be patient and adopt an optimal type of development that reflected the highest and best use for the land which would bring the greatest long range benefit to the Cambridge community. The panel proposed a long-term, sophisticated, large-scale, mixed-use optimal type of development.

The ULI panel’s professionalism and diligence in carrying out its mission impressed and gained the confidence of the CRA and Cambridge City Council which endorsed the panel’s recommendations and approved a Kendall Square Urban Renewal Plan for a mixed-use development, with the general objectives of generating tax revenues and jobs.

The ULI panel also warned that attracting developers would not be easy: "Citizen concerns, political pressures, economic uncertainty, and the absence of a united and strong development process have combined to create a credibility problem with the real estate development community". The Panel advised the CRA could overcome developer skepticism about the development climate in Cambridge by establishing a record for getting things done.

The CRA responded by removing all legal and technical impediments to development; completing an Environmental Impact Statement; securing plan and zoning amendments; and carrying out a $7-million public improvements program, including construction of infrastructure and execution of traffic circulation plans.

5. Boston Properties selected to develop Cambridge Center

For marketing purposes the name Cambridge Center was adopted to refer to the 24 acres in the Kendall Square Urban Renewal Project outside of the land occupied by DOT. In 1978, the CRA invited proposals to develop Cambridge Center. Four well qualified developers were selected as finalists, including Boston Properties which was not as well known in the Boston area as the other developers. After exhaustive interviews with each developer and analysis of each development proposal, the CRA designated Boston Properties as developer for Cambridge Center because it had two significant advantages over its competition:

1. Boston Properties’ two principals had worked as a team for many years producing a number of successful well-designed real estate developments nationwide. In contrast, the other finalists had undergone changes or formed new teams, making evaluations of future performance difficult.

2. Boston Properties’ financial capabilities were impressive. It was well capitalized and had a net worth adequate to sustain a large and complex development such as Cambridge Center. It had current assets sufficient to fund first-rate design and site planning; a cash flow arising from a broad, geographically diverse base of real estate investments that could support substantial start-up costs and sustain development during difficult economic times; and a proven ability to manage investment property effectively and efficiently.

Boston Properties turned out to be the right choice because it had the background, experience, resources and patience to attract the type of users that met the standards proposed in the ULI recommendations, that of promoting land development to its highest and best uses. Subsequently, the development of Cambridge Center benefitted the City of Cambridge by achieving goals for the amended Kendall Square Urban Renewal Plan set by the Cambridge City Council: generating $15-million in annual property tax revenues and 7,500 jobs.

6. High-tech development

The combination of (a) the presence of MIT, an international leader in high-tech research and innovation; (b) Polaroid’s decision to locate in Technology Square, a real estate development started in the 1960’s by Cabot, Cabot and Forbes in partnership with MIT that also included Rogers Block, a CRA urban renewal project adjacent to the Kendall Square Project; (c) the presence of Draper Laboratories in the immediate neighborhood; and (d) decisions by the Whitehead Institute and Biogen in 1982 to locate in the Kendall Square Urban Renewal Project area were key elements leading to the emergence of high-tech development in the Kendall Square Project, and helping to attract major technology and biotechnology development in the eastern sector of Cambridge. Today there are over 163 institutional research companies within a 1-mile radius of the Kendall Square Urban Renewal Project area.


P.S. Robert F. Rowland was CRA Executive Director during all the episodes from 1963 to 1982.

As CRA Associate Director, Thad Tercyak participated directly in the episodes from 1968 to 1990.

April 22, 2013

The Bottom Line – April 22, 2013 Cambridge City Council Agenda Highlights

Filed under: Cambridge,City Council,Kendall Square — Tags: , , — Robert Winters @ 1:54 am

This last week has been one of pure horror in Boston, Cambridge, Watertown and vicinity – the Marathon Day bombing that killed 3 people and maimed many others, the murder of MIT police officer Sean Collier and subsequent carjacking, the gunfight in Watertown that put an end to one of the murderers, and finally the dramatic capture of the other murderer. The fact that these murderers have been living in Cambridge for the last decade and that one of them recently was awarded a scholarship from the City of Cambridge left many of us stunned. We now have some resolution as the investigation continues and charges are pending, but this was a week few of us will soon forget.

Life goes on, I guess, and so do civic affairs, including the following items of interest on Monday night’s agenda:

Manager’s Agenda #1. Transmitting communication from Robert W. Healy, City Manager, relative to the FY2014 submitted budget and appropriation orders.

Here’s a table showing the total proposed budget by department as well as the figures from last year and from 9 years ago together with percentage changes. Draw your own conclusions, but one thing that jumps out is the steep increase in public investment. We’ll get more details Monday night when the Budget Book is publicly available, but it’s likely that new school construction and ongoing sewer work will comprise a substantial part of the budgeted amount for public investment. On a minor note, how is $143,940 justified for maintaining the "Peace Commission?" Isn’t it about time we took another look at consolidating some of these non-regulatory, yet budgeted, boards and commissions?

City of Cambridge Budget Totals by Department – FY2014

GENERAL GOVERNMENTFY05 submittedFY13 submittedFY14 submitted1 yr % change9 yr % change
Mayor$430,035$554,040$558,7850.929.9
Executive$1,353,140$2,068,675$2,008,150-2.948.4
City Council$975,570$1,642,165$1,683,1252.572.5
City Clerk$720,925$1,067,130$1,119,7654.955.3
Law$1,780,975$2,061,495$2,163,2404.921.5
Finance$8,837,560$12,350,575$13,292,3507.650.4
Employee Benefits$20,499,920$31,796,130$32,787,2003.159.9
General Services$984,345$726,475$732,6950.9-25.6
Election$756,540$1,004,285$1,013,5650.934.0
Public Celebrations$671,505$799,370$891,94511.632.8
Reserve$37,500$37,500$37,5000.00.0
TOTAL$37,048,015$54,107,840$56,288,3204.051.9
PUBLIC SAFETYFY05 submittedFY13 submittedFY14 submitted1 yr % change9 yr % change
Animal Commission$228,870$298,585$309,7003.735.3
Fire$28,891,840$40,111,145$43,350,2758.150.0
Police$31,515,220$45,643,095$47,186,0153.449.7
Traffic, Parking & Transportation$8,175,095$10,551,435$10,935,0153.633.8
Police Review & Advisory Board$77,210$70,730$73,4403.8-4.9
Inspectional Services$2,261,215$3,115,045$3,180,0452.140.6
License$726,735$986,140$1,030,9704.541.9
Weights & Measures$98,910$134,325$138,5403.140.1
Electrical$2,239,640$2,792,005$2,840,9101.826.8
Emergency Management$137,820$0  -100.0
Emergency Communications$3,097,485$4,242,970$4,434,4254.543.2
TOTAL$77,450,040$107,945,475$113,479,3355.146.5
COMMUNITY MAINT/DEVELOPMENTFY05 submittedFY13 submittedFY14 submitted1 yr % change9 yr % change
Public Works$23,648,125$31,945,265$32,859,6902.939.0
Community Development$4,472,620$5,482,210$5,676,3403.526.9
Historical Commission$457,580$587,025$632,9407.838.3
Conservation Commission$89,760$101,925$123,47021.137.6
Peace Commission$76,215$139,595$143,9403.188.9
Cable T.V.$999,500$1,436,360$1,474,7952.747.6
Debt Service$23,917,070$47,526,975$49,716,2504.6107.9
TOTAL$53,660,870$87,219,355$90,627,4253.968.9
HUMAN RESOURCE/DEVELOPMENTFY05 submittedFY13 submittedFY14 submitted1 yr % change9 yr % change
Library$5,461,430$8,710,520$8,946,3952.763.8
Human Services$14,581,590$22,480,760$23,155,0803.058.8
Women’s Commission$155,860$225,425$233,1153.449.6
Human Rights Commission$158,730$220,160$249,38013.357.1
Veterans$510,885$981,165$1,005,3752.596.8
TOTAL$20,868,495$32,618,030$33,589,3453.061.0
CITY TOTAL$189,027,420$281,890,700$293,984,4254.355.5
EDUCATIONFY05 submittedFY13 submittedFY14 submitted1 yr % change9 yr % change
Schools Operating (TOTAL)$122,053,195$144,987,705$150,989,4454.123.7
INTERGOVERNMENTALFY05 submittedFY13 submittedFY14 submitted1 yr % change9 yr % change
MWRA$16,177,455$21,006,055$21,346,8151.632.0
Cherry Sheet Assessments$11,569,960$19,700,025$20,126,9502.274.0
Cambridge Health Alliance$6,500,000$6,500,000$6,500,0000.00.0
TOTAL$34,247,415$47,206,080$47,973,7651.640.1
GRAND TOTALS$345,328,030$474,084,485$492,947,6354.042.7
 FY05 submittedFY13 submittedFY14 submitted1 yr % change9 yr % change
WATER$17,098,120$14,144,080$14,238,7000.7-16.7
PUBLIC INVESTMENT$8,834,255$21,277,065$92,715,930335.8949.5

There are also these items of interest, offered with minimal comment:

Manager’s Agenda #3. Transmitting communication from Robert W. Healy, City Manager, relative to Awaiting Report Item Number 13-03, regarding a report on the possibility of a gun buy-back program.

This is not recommended due to limited effectiveness and better alternatives.

Manager’s Agenda #4. Transmitting communication from Robert W. Healy, City Manager, relative to Awaiting Report Item Number 13-20, regarding a report on the feasibility of providing a service in which residents are able to look up their voter registration status online.

This is feasible and the City is looking into implementing it at some point in the near future.

Manager’s Agenda #11. Transmitting communication from Robert W. Healy, City Manager, relative to the Gartner IT Strategic Plan report.

Seems like a good thing looking toward the future of "e-government", but I’ll need a robot to read the report for me.

Manager’s Agenda #24. Transmitting communication from Robert W. Healy, City Manager, relative to a request from Boston Properties that the City of Cambridge consider the disposition of approximately 8,660 square feet of land on the east side of Ames Street between Main Street and Broadway to enable Boston Properties to develop residential uses on that site.

This is part of the fulfillment of a promised 200,000 square feet of housing, though it’s not clear if all of that is to be associated with this project. The proposed development will also include ground floor retail and is consistent with the City’s future plans for the reconfiguration and reconstruction of Ames Street.

Unfinished Business #16. Transmitting communication from Robert W. Healy, City Manager, relative to Council Order Numbers 13 and 14 of Mar 18, 2013, regarding revised zoning language to the Section 11.700 entitled Interim Regulations for Medical Marijuana Uses. The question comes on passing to be ordained on or after Apr 15, 2013. Planning Board hearing held Jan 22, 2013. Petition expires Apr 22, 2013.

This interim measure is something of a formality and will likely be ordained at this meeting.

Resolution #2. Retirement of George Fernandes from the Electrical Department.   Mayor Davis

Don’t worry, we’ll turn off the lights at the end of the meeting. This is another significant retirement.

Resolution #24. Thanks to the City of Cambridge’s first responders for their assistance in the aftermath of the Boston Marathon tragedy.   Mayor Davis, Councillor Maher

When this resolution was filed, nobody knew just how significant a role the Cambridge Police and the MIT Police would play as events unfolded. We should salute all of the officers and other police personnel who were involved.

Order #1. That the City Council go on record urging the 113th Congress to enact comprehensive immigration reform as outlined in this resolution that addresses (1) earned legalization with a path to citizenship; (2) updated future immigration of families and workers; and (3) improved immigration enforcement and border security that is consistent with our nation’s values.   Vice Mayor Simmons

This is, of course, a very large issue that should have been addressed directly some time ago, but it seems inevitable that the debate will now be influenced by the very small sample of events that unfolded here over this past week.

Committee Report #1. A communication was received from Paula Crane, Administrative Assistant, City Clerk’s Office, transmitting a report from Councillor Leland Cheung, Chair of the Cable TV Telecommunications and Public Utilities Committee for a public meeting held on Apr 2, 2013 to discuss the ability of the City’s existing utility infrastructure to meet long-term increases in demand.

This was an interesting meeting about a topic that most people don’t even think about – utility infrastructure and capacity. The report is very informative.

Committee Report #2. A communication was received from Donna P. Lopez, Interim City Clerk, transmitting a report from Councillor David P. Maher, Chair of the Ordinance Committee, for a public hearing held on Apr 3, 2013 to discuss an amendment to the Zoning Ordinance to create a new Section 6.100 Bicycle Parking, and to create a new definition for Bicycle Parking in Article 2.000, modify the yard standards in Article 5.000 as they relate to bicycle parking and modifying various sections of Article 6.000 to remove references to bicycle parking.

This is a good idea and overdue, though the proposal really doesn’t go far enough. As proposed, bicycle parking would be mandatory for most new residential and commercial developments, but it fails to address major renovation of existing residential buildings. Multi-family houses with existing basement space suitable for bicycle storage are being turned into million-dollar condos and these projects should be subject to the same regulations as new developments.

Though not on the agenda, I do hope some brave councillor speaks to the now obvious value of surveillance cameras as an important tool in protecting public safety. A Late Order empowering the City Manager and the Cambridge Police Department to switch on the equipment already installed would be a nice gesture. – Robert Winters

April 10, 2013

“A Better Future for A Better Cambridge” – updated

Filed under: Cambridge,Central Square,Kendall Square,planning — Tags: — Robert Winters @ 2:45 pm

How can we plan for urban growth in Cambridge to promote a more diverse, livable, and sustainable city for all residents?

An esteemed panel will address the coming demographic shifts that will put further pressure on the Cambridge’s housing market and our transportation systems, and talk about solutions that can make Cambridge a leader in defining a new urban America in the age of climate change.

  • Frederick P. Salvucci, Former Massachusetts Secretary of Transportation and current MIT Professor of Civil Engineering
  • Barry Bluestone, Founding director of the Dukakis Center for Urban and Regional Policy at Northeastern University
  • Amy Cotter, Director of Regional Plan Implementation for the Metropolitan Area Planning Council (MAPC)

Moderated by Renee Loth, Editor at ArchitectureBoston and former Editorial Page Editor for the Boston Globe.

Thursday, April 11th
7:00PM
Cambridge College
1000 Massachusetts Ave.

All are welcome! Please register online to let us know you’ll be participating in the discussion: http://abettercambridge.org/register-forum

Sponsored by A Better Cambridge | Working to build a more diverse and dynamic Cambridge on the path toward sustainable growth.

Web: http://abettercambridge.com | Facebook: http://facebook.com/ABetterCambridge | Twitter: @ABetterCambMA

April 9, 2013

MIT/Kendall Night at City Hall – Apr 8, 2013 City Council meeting (updated)

Filed under: City Council,Kendall Square,MIT — Tags: , , — Robert Winters @ 9:40 am

MIT/Kendall Night at City Hall – Apr 8, 2013 City Council meeting

Though there are a few other items on the agenda, this meeting is clearly centered on the potential ordination of the MIT/Kendall zoning petition that was introduced in December 2012, but which has actually been around, debated, and refined since its original introduction over two years ago. There have been many meetings of the Ordinance Committee and the Planning Board on the substance of this petition plus volumes of input from the public.

The central agenda item is this:

Unfinished Business #15. A communication was received from Donna P. Lopez, Interim City Clerk, transmitting a report from Councillor David P. Maher, Chair of the Ordinance Committee, for a public meeting held on Mar 7, 2013 to continue discussions on the petition by MIT to create a new Section 13.80 Planned Unit Development 5 (PUD-5) District; specifically to discuss Uses, Incentive Zoning, Community Fund, Housing and Sustainability. A presentation will be made by the Executive Director of Historical Commission on historic building. The question comes on passing to be ordained on or after Apr 1, 2013. Planning Board hearing held Jan 15, 2013. Petition expires Apr 15, 2013.

A related Order from Councillor Decker highlights one feature that is now part of the revised language of the petition:

Order #1. That the text of the MIT Zoning Petition be amended to increase the inclusionary housing from 15% to 18%.   Councillor Decker

The last Ordinance Committee report on this matter is this:

Committee Report #3. A communication was received from Donna P. Lopez, Interim City Clerk, transmitting a report from Councillor David P. Maher, Chair of the Ordinance Committee, for a public meeting held on Apr 2, 2013 to continue discussion on the petition by MIT to create a new Section 13.80 Planned Unit Development 5 (PUD-5) District; said report contains text of zoning language with changes since the Planning Board referral and a draft letter of commitment.

Though there may be other efforts to amend the proposed zoning amendment on the floor, the latest version as submitted is here:

Communications & Reports from City Officers #1. A communication was received from Councillor David Maher transmitting additional information received from Steven C. Marsh, Managing Director, Real Estate MITIMCo., regarding the MIT revised draft zoning amendment, a revised commitment letter and a table providing an overview of the public benefits contained in the revised commitment letter and the revised draft zoning ordinance amendments. [HTML Version of Revised Petition & Letter of Commitment]

There is much that could be said at this point about the MIT/Kendall Petition. In spite of questionable claims of MIT faculty opposition to the proposal, most of the letters from the MIT faculty and administration have shown clear support. Many of the suggestions of the East Cambridge Planning Team have been incorporated into the proposal. There are legitimate arguments that can be made in favor of MIT providing additional housing for graduate students and post-docs, but there is no reason why that housing should be located in Kendall Square. There is also an ongoing analysis within MIT to determine the best ways to address these housing needs, and there is every reason to believe that MIT will act in good faith to ultimately do what’s in the best interest of its students. This may well mean that new housing will be constructed at the opposite end of the MIT campus.

The arguments of naysayers as this matter heads into its final stage have focused on two red herrings – graduate student housing and claims that the plan does not mandate sufficient "sustainability" requirements. When you consider the fact that none of the new buildings in this PUD-5 zone have actually yet been designed, it makes you wonder what blueprints these naysayers have been consulting. The misinformation has all the earmarks of political organizing during a municipal election year.

On balance, the MIT/Kendall Petition, as amended, is a good plan and it should be ordained. MIT has responded well to most of the requests of City staff and the elected officials. If two-thirds of the City Council see fit to pass the zoning amendment, they should be congratulated for keeping their eye on the many positive benefits of the plan and for navigating wisely through a sea of misinformation spread by reactionaries and political wannabes. There’s more to being a good elected official than just being able to say NO to everything. – Robert Winters


Apr 8 update on the MIT/Kendall Petition

The MIT/Kendall zoning petition was ordained as amended on a 7-1-1 vote with Councillor vanBeuzekom voting NO (as expected) and Vice Mayor Simmons voting PRESENT. The revised Letter of Commitment from MIT was approved unanimously.

Prior to final ordination a series of amendments were proposed by several councillors. Councillor Kelley objected strenuously to the late arrival of the proposed amendments and, in doing so, he came across as the smartest guy in the room. There were so many opportunities to propose amendments during the months, weeks, and days leading to this vote, that there was no excuse for trying to rush these amendments through. Nothing good came of it.

The late parade of amendments began with Councillor Cheung proposing some modifications of the percentages in section 13.83.2(d). This squeaked by on a 5-4 vote with Councillors Cheung, Decker, Reeves, Simmons, and vanBeuzekom voting in favor. Next came Councillor Cheung’s amendment to increase the maximum height of the proposed residential tower from 300 ft. to 350 ft. That failed on a 4-5 vote with Councillors Cheung, Reeves, Simmons, and vanBeuzekom voting in favor.

Then Councillor vanBeuzekom proposed a reduction in the maximum permissible nighttime noise levels from 65db to 55db. Councillor Kelley opined that this was a matter that should be viewed in a citywide context. The amendment failed 4-5 with Councillors Cheung, Simmons, vanBeuzekom, and Mayor Davis voting in favor. The next amendment by Councillor vanBeuzekom to require "net zero" energy standards enjoyed a temporary victory on a 5-3-1 vote with Councillors Cheung, Decker, Simmons, vanBeuzekom, and Mayor Davis voting YES; Councillors Kelley, Maher, and Toomey voting NO; and Councillor Reeves voting PRESENT. Later in the meeting, when informed that this burden could threaten MIT’s other commitments, Mayor Davis reluctantly asked to change her vote from YES to PRESENT which defeated the amendment 4-3-2. This was a vote change that Mayor Davis clearly did not relish, but she did it for the greater goal of passing the entire package.

The last amendment was from Councillor Decker and will likely be the one that brings some repercussions. She proposed that the $10 million that was to be dedicated to a Community Fund be transferred to a general mitigation fund not tied in any way to the K2C2 principles. It is my understanding that this has the effect of cutting out the role of people from the adjacent neighborhood organizations in the mitigation fund. The amendment passed on a 5-4 vote with Councillors Cheung, Decker, Reeves, Simmons, and vanBeuzekom voting in favor.

It was also revealed that Councillor Decker’s Order #1 to increase the Inclusionary Zoning percentage from 15% to 18% was meant to be a citywide proposal. She withdrew her Order and will resubmit it as a citywide proposal at a later date. – RW

March 31, 2013

Early look at the April 1 Cambridge City Council agenda

Filed under: Cambridge,City Council,Kendall Square,MIT — Tags: , — Robert Winters @ 9:14 pm

Early look at the April 1 Cambridge City Council agenda

Here’s a sneak peek at what’s coming up at Monday’s City Council meeting:

City Manager’s Agenda #2. Transmitting communication from Robert W. Healy, City Manager, relative to Awaiting Report Item Number 13-29, regarding a report on the feasibility of not allowing residents of new buildings to obtain on-street resident parking stickers.

The City Solicitor reports that this question was already fully answered 11 years ago when the question arose whether resident parking stickers could be withheld from Harvard students residing in Harvard dormitories. The advice then as now was that a resident of Cambridge whose motor vehicle is registered in Massachusetts and principally garaged in Cambridge is entitled to receive a resident parking sticker. End of story.

Another zoning petition arrives:

Applications & Petitions #2. A zoning petition has been received from Michael Phillips, et al., requesting the City Council to amend the Zoning Ordinance to the Special District 2 (SD-2) zoning district in North Cambridge.

Heather Hoffman insists that the East Cambridge Planning Team has expressed no opinion on the MIT/Kendall Zoning Petition in:

Communications #2. A communication was received from Heather Hoffman regarding the MIT petition and East Cambridge Planning Team.

Councillor Maher, Chair of the Ordinance Committee responds with:

Order #7. That Committee Report #6 of Mar 18, 2013 be amended on page two in the second paragraph by striking out the sentence that reads: "The MIT proposal has received support from the East Cambridge Planning Team."   Councillor Maher

So what DOES the East Cambridge Planning Team really have to say about this? Inquiring minds want to know.

Contrary to the fanciful claims of the Wizard of Essex Street that the MIT faculty doesn’t like the MIT/Kendall Petition, there are these:

Communications #6. A communication was received from Marc Kastner, Dean, School of Science, Donner Professor of Science, MIT School of Science transmitting strong support for the Institute’s proposed rezoning of Kendall Square.

Communications #7. A communication was received from Adele Naude Santos, Dean, Professor of Architecture and Planning, School of Architecture + Planning transmitting enthusiasm and support for the Institute’s Kendall Square proposal.

Communications #9. A communication was received from David Schmittlein, John C Head III Dean, MIT Sloan School of Management, Professor of Marketing transmitting support for the Institute’s proposed rezoning of Kendall Square.

Could it be that the "MIT Faculty Newsletter" is not actually the newsletter of the MIT faculty? It sure seems like it.

We should all be entertained by Councillors Decker and Cheung when this comes up:

Order #1. That all public meetings and hearings be conducted within the city limits and have a Cambridge address, and in the event that a public meeting or hearing is held outside of the city limits, that a vote be required of the City Council to approve said meeting or hearing being held outside the city limits.   Councillor Decker

Vice Mayor raises a valid question with:

Order #3. That the Government Operation and Rules Committee is requested to provide an update to the City Council on any progress that has been made in drafting a Community Benefits & Mitigation Plan, and that an expected timeframe in which a formal recommendation on policy might be made to the City Council is also provided.   Vice Mayor Simmons

Councillor vanBeuzekom declares war in:

Order #14. That the City Manager is requested to urge the Cambridge Retirement Board of Trustees to cease investments in fossil fuel companies, review Cambridge’s investment portfolio, contact fund managers for any fossil fuel company investments, prepare a report which explains options for investing in the pension fund in a way that maximizes positive impact of the fund, establish investment policies which support local projects and jobs, create a timeline for implementation of findings and release annual updates.   Councillor vanBeuzekom

Will Cambridge ban gasoline after they ban plastic bags, styrofoam, and soda pop? Will they declare Cambridge a pepperoni-free zone? – Robert Winters

February 10, 2013

Housing and the Kendall Square/MIT Petition

Filed under: Cambridge,Kendall Square,MIT,planning — Tags: — Robert Winters @ 6:19 pm

Housing and the Kendall Square/MIT Petition

There was a forum at MIT on Wed, Feb 6 hosted by the MIT Graduate Student Council that addressed some of the issues associated with the current MIT/Kendall Sq. zoning petition now before the Cambridge Planning Board and the Cambridge City Council. This forum was intended for an MIT audience, and only MIT affiliates were invited. It was an honor to have been asked to be a panelist at this forum. The forum was very well attended and required an overflow room to accommodate all the graduate students, undergraduates, post-docs, faculty, staff and administration who came to hear the plans and ask questions.

The good folks of the MIT GSC know how to run a very good meeting that showcases multiple viewpoints while refraining from advocacy. Special acknowledgement goes to GSC President Brian Spatocco who deserves to one day be the mayor or governor of somewhere, somehow, based on his ability to be so informative, fair, and objective.

After the introductions, the forum opened with Israel Ruiz (MIT Executive Vice-President & Treasurer) and Steve Marsh (Managing Director of Real Estate, MIT Investment Management Corporation – MITIMCo) explaining the elements of the zoning petition and its purpose. The panelists were Martin Schmidt (Associate Provost & Prof. of Electrical Engineering and Computer Science), Linda Patton (Asst. Director of Off-Campus Housing), Bob Simha (Director of Campus Planning, 1960-2001 and DUSP Lecturer), Jonathan King (Prof. of Biology), Robert Winters (mathematics lecturer, editor of Cambridge Civic Journal), Ruth Perry (Prof. of Literature), and Thomas Kochan (2030 Faculty Task Force & Professor of Management).

Though the organizers were aware of which panelists might speak favorably or unfavorably about the zoning petition (so that they could provide balance), there were no conditions on what specific topics each panelist could address. I chose to focus on the context of housing for graduate students and on the affordability of housing in general. I tried to look at things from my point of view as someone who was an MIT graduate student starting in 1978 and who bought a three-family house in 1985 where I continue to live today. Though I may have skipped a point or two, here are the points I tried to make during my presentation:

The situation as it used to be (circa 1978):

1) There was a significant supply of multi-family housing stock in Cambridge.

2) Rent control was the law for much of the housing stock.

3) The great majority of graduate students preferred to live off-campus rather than in MIT dormitories.

4) Most graduate students were content to live in housemate situations, often with 3 or 4 or more to an apartment. Luxury accommodations were not in demand.

5) There were relatively few post-docs.

6) Kendall Square as a job generator did not really exist.

What happened? (the perfect storm)

1) Rent control ended as a result of a 1994 statewide initiative petition.

2) Much of the multi-family housing stock was converted to (high-end) condominiums.

3) Kendall Square and elsewhere was developed without concurrent housing – greatly increasing the pressure on existing local housing stock for both rental and ownership opportunities.

4) There was a significant increase in post-doc opportunities (in lieu of tenure-track faculty opportunities) – significantly increasing the grad/post-doc pool of people competing for housing.

5) Changing expectations – grad students/post-docs are demanding much higher quality housing, often shunning housemate situations.

6) Among some grads/post-docs, there is a greater need to be close to their labs.

7) There has been a national shift toward people preferring to live in urban environments, reversing the earlier pro-suburban movement among faculty, professional people, and seniors.

8) Any new housing built in and around Kendall Square will also be occupied by people who work in Boston and elsewhere.

The Net Effect:

All of these factors (and more) affect the availability and affordability of housing in and around Cambridge – not just for graduate students but for everyone. The problem is pervasive and is compounded by the resistance by many existing residents toward the construction of new housing in Cambridge and elsewhere. The isolated construction of a limited amount of housing anywhere in Cambridge will have a negligible effect on the overall housing problem. Indeed, it can even paradoxically have the opposite effect by attracting people toward this limited supply of new units who will then bid up the price to create a local "bubble" in the price of housing.

Indeed, the only way to reverse this "perfect storm" is to advocate for significant amounts of new housing in Cambridge, in Somerville, in Allston, in Charlestown, and elsewhere in the greater Boston area. Only when there is a range of housing choices at various rents and locations will any kind of rental housing market be restored in which people can make rational economic choices such as living a little further away or in less luxury in exchange for paying less rent. Trying to create a smattering of "affordable housing" units via inclusionary zoning or government subsidy will never have more than a limited effect on the essential problem. There are just too many factors conspiring to make housing unaffordable. If graduate students really want affordable housing, they should be clamoring for many thousands of housing units to be built everywhere in the area – and not just in Kendall Square and Cambridge.

Locally, it may well be that condominium conversion has had the greatest impact on this loss of affordability. Where once there were streets lined with two-family houses and triple-deckers that provided affordable housing for a resident owner AND for the other tenants in a building (including many graduate students), there are now luxury condominiums where the prices have been bid up to the point of unaffordability except for those in the upper income echelons. The only "working class" residents remaining are those who bought their housing long ago, inherited it, married well, or those with some expertise in benefiting from government-subsidized housing and related programs.

There are also people like me who bought their homes and continued to rent apartments to graduate students, post-docs, and others and who managed to pay off their mortgages without ever excessively raising rents. My affordable housing continues to provide the affordable housing for two other families who were graduate students when they first arrived. Cambridge would be a better place today if more of its two- and three-family homes had never been turned into luxury condominiums. Failure to put some limits on that condominium conversion may be the single greatest reason why MIT graduate students can no longer find affordable housing opportunities in Cambridge. This is also one of the greatest public policy failures by Cambridge elected officials who put all their faith in rent control. Building "affordable housing" today really is like closing the stable doors long after the horses have run away.

The MIT/Kendall Petition

This petition basically redefines the upper limits (heights, density) of what might be constructed in the area east of Ames Street, south of Main Street (plus the area around One Broadway to Broad Canal), and down to Memorial Drive. This petition is both timely and appropriate. This area has always had a mix of uses, including industrial uses. It’s also located at a major Red Line T station, and virtually all planning professionals agree that it’s best to concentrate density close to public transportation. The petition would only define the envelope of what could be built and not precisely what will be built.

Any debate regarding the appropriateness of commercial buildings vs. academic buildings vs. residential buildings in the petition area should really not be taking place before the Cambridge Planning Board or the Cambridge City Council (though this may affect how the petition is received by these respective bodies). This debate is properly one that must occur within the MIT community – administration, real estate investment people, faculty, staff, and students – and preferably also among those who live and work in the surrounding area.

MIT/Kendall plan - courtesy of Israel Ruiz
photo from MIT’s The Tech

Text of MIT/Kendall Petition

Jan 11, 2013 Memo from Community Development Dept. (CDD)

Regarding the graduate student housing issue

MIT can provide a good "Plan B" option for graduate students and post-docs by having ample on-campus and near-campus MIT-owned residential properties (especially for those who need to be close to labs, etc.), but this will barely make a dent in the larger problem. Many, perhaps most, graduate students and post-docs will continue to seek housing options off-campus – preferably within walking or bicycling distance. The focus has to be on increasing housing options within a reasonable distance of the MIT campus and not just on building housing within the MIT campus. Unfortunately, this is not something that MIT can unilaterally accomplish. It also requires action by local and state government AND by the developers who will ultimately build sufficient housing to restore some kind of viable housing market. Building "affordable housing" is fundamentally just politically expedient window-dressing.

A note on transportation

People really are choosing to be less reliant on automobiles, so public transportation infrastructure has to grow and to provide more frequent service and more reliable connections, and the entire system has to evolve from a hub-and-spokes model to more of a regional network. Otherwise we will be forever limited by the capacity of the hub in Boston. In the coming decades it will be very advantageous if a variety of new transit lines can be developed that do not require passing through the hub of Boston.

Etcetera

Whatever comes of the MIT/Kendall petition and of future plans for the petition area, it is essential that the results should not be boring. There really is a place for food trucks, diners, bumper cars, miniature golf, and other things that will have great appeal to many people – especially to MIT affiliates who have always had a love for things eclectic, entertaining, and affordable. There’s a reason why those food trucks are so popular. Those whose memories go back several decades understand that those food trucks are modern versions of the old F&T Diner. There has to be a place in the future East Campus where modern-day memories will be created – the 21st Century incarnations of the F&T, Pritchett Lounge, and the Muddy Charles Pub. People can reasonably debate the relative merits of housing vs. academic buildings vs. commercial buildings that will help finance long-overdue renovations of existing MIT buildings. However, if the future is boring and pathetically predictable, that will be unforgivable. – Robert Winters

Comments?

F&T 1

F&T 2

F&T 3

« Newer PostsOlder Posts »

Powered by WordPress