Cambridge Civic Journal Forum

October 15, 2014

Catching up on the Cambridge News (Sept-Oct 2014)

Filed under: Cambridge — Tags: , — Robert Winters @ 5:08 pm

Catching up on the News (from September-October 2014 press releases and other sources)

Topping Off the King School - Sept 18, 2014Cambridge Celebrates First Municipal Building Targeting Net Zero Energy

City officials celebrated a major construction milestone at a topping off ceremony September 18 of the new Dr. Martin Luther King Jr. Elementary School at 100 Putnam Avenue, Cambridge. Designed by Perkins Eastman, the innovative school, which is targeting Net Zero Energy, is scheduled to open in time for the 2015-2016 school year.

The 169,000 sq. ft. school and the 18,200 sq. ft. parking structure will contain all new facilities and equipment for its classrooms, a library, auditorium, gymnasium, community rooms and new outdoor play space. The building will accommodate 740 students and 125 staff in a JK-5 Lower School and an Upper School for grades 6-8. Expressly designed to be a center of its community, the school will include a 40-student preschool and robust community school and afterschool programs.

The new building is projected to have an Energy Use Intensity 60% less than typical educational buildings in New England and will save energy through proper orientation, pervasive natural light in almost every space, and high-performance roof and wall assemblies. In addition to user-specific energy-saving measures, the school will offset energy demands by producing energy through photovoltaic panels mounted on the roof and south-facing facades.

Topping Off the King School - Sept 18, 2014The design for the new school was driven by the idea of the school as a community, with the Lower School and the Upper School operating as distinct “neighborhoods” connected by an internal thoroughfare, named King Street, from which the shared community spaces are accessed. In support of extending learning into the environment, an important feature of a 21st century school, the school will include a City Sprouts garden, a preschool playground, a teacher’s patio, a courtyard garden featuring an indoor/outdoor performance space and roof terraces.

This school building will be unlike any building the city has seen before,” said City Manager Richard C. Rossi, adding that it is also the first city building expected to achieve LEED Platinum certification. “This is a solid investment we are making in the children of Cambridge. When the school, as well as street and sidewalk improvements to the area are completed, we believe it will be the envy of the community and a beautiful new amenity for the faculty, the students, the parents and the neighborhood.”


Cambridgeport School receives $500,000 from Cambridge Preservation Act (CPA) funds for new Playground
School playground will get much needed update to better serve younger student population.

On Monday, September 15th, the Cambridge City Council followed the Community Preservation Act Committee’s recommendation and voted to allocate $500,000 of Cambridge Preservation Act (CPA) funds to redesign and renovate the Cambridgeport School Playground. In April of this year, Cambridgeport Principal Katie Charner-Laird reached out to Mayor David P. Maher to request an updated playground that was more appropriate for the schools younger demographic. Mayor Maher moved swiftly, asking that the City Manager Richard C. Rossi, and the Department of Public Works look into the possibility of using CPA funds to update the playground. Mayor Maher stated “with the creation of the Innovation Agenda, the Cambridgeport School went from a K-8th grade to a K-5th grade school which meant that the playground was not age appropriate. My office was able to work with the City to quickly rectify the situation and secure an appropriate amount of funding for a project like this.”

With a series of meetings in the Cambridgeport School library, Mayor Maher, co-chair of the School Committee Fred Fantini, City Manager Rich Rossi and Deputy City Manager Lisa Peterson were able to meet with parents and staff to better understand their community’s needs and move forward with some interim measures as well as start the CPA request process.

From those meetings the Cambridgeport School parents became fully engaged with the process and collected over 250 signatures from parents, neighbors and staff with an online petition to the CPA to request their support of allocating the funds to the playground.

Cambridgeport parent Elizabeth Liss initiated the petition which was presented at the CPA August meeting. Ms. Liss stated, “As a Cambridgeport School parent I am thrilled to learn that the City has allocated funds to rebuild our playground. The space is a vital part of our school and the community it serves, and it is gratifying to know that the voices of parents and neighbors were heard and respected. A huge thanks to Mayor Maher and Principal Charner-Laird and Community Preservation Act Committee members for coming together in a positive way.

Cambridgeport Principal Katie Charner-Laird is thrilled that her school will be the recipient of these funds, “Cambridgeport families are so grateful that the city has taken on this project of renovating the playground. Our student body shifted in age pretty dramatically a few years ago, and now more than half of our students are under the age of six.” says Charner-Laird, “The current playground is outdated and also isn’t designed for younger children. We are all excited to engage in a community process to help design a playground that works for everyone. A playground is a true gift of childhood, and we thank all who worked so hard to bring this particular playground into the spotlight.

I look forward to working with the community to make the Cambridgeport School playground an amazing place for its students. We have a great model with the Haggerty School redesign that we can use to help inform the process.” Says Cambridge School Committee co-chair Fred Fantini, “Cambridge does a wonderful job responding to its citizens and their needs and this project is no exception.


Sept 30, 2014The Cambridge Planning Board tonight voted unanimously to grant the Special Permits for the Sullivan Courthouse redevelopment. [Cambridge Chronicle story by Sara Feijo]

Alewife development gets the OK; Developer and city still at odds over parking

Oct 7, 2014 – The Cambridge Planning Board approved unanimously a series of special permits to convert the parking lot at 88 Cambridgepark Drive in North Cambridge into a large mixed-use complex. [Cambridge Chronicle story by Sara Feijo]


Voter Registration and Absentee Ballots for the State Election, November 4, 2014

The State Election will be held on Tuesday, November 4, 2014. For Cambridge residents not already registered, the last day to register to vote is Wednesday, October 15, 2014 until 8:00pm. The polls will be open on Election Day from 7:00am until 8:00pm.

Absentee Ballots are now available at the Cambridge Election Commission office. Any voter who is unable to go to the polls on Election Day due to physical disability, religious belief, or absence from the City may request an Absentee Ballot from the Commission. The deadline to apply for an Absentee Ballot is Monday, November 3, 2014 at Noon. Absentee Ballots may be mailed to voters, or such voters may choose to vote at the Commission office during regular city office hours: Monday, 8:30am-8:00pm; Tuesday-Thursday, 8:30am-5:00pm; Friday, 8:30am-Noon. The office will also be open for Absentee Voting on Friday, October 31st from 8:30am until 5:00pm and on Saturday, November 1st from 9:00am until 5:00pm.

For any additional information, please visit the Cambridge Election Commission office at 51 Inman Street, call (617-349-4361) or visit our website at www.cambridgema.gov/election.


Corinne Espinoza Appointed as Cambridge Community Center Interim Executive Director

Oct 13, 2014 – The Cambridge Community Center (CCC) has appointed Corinne Espinoza, a resident of Cambridge, Mass., as Interim Executive Director.

Corinne EspinozaEspinoza is a graduate of Mount Holyoke College and the CWD Harvard Leadership Development Program, and brings with her two decades of professional and volunteer experience. Her professional competencies include accounting and finance, change management, process improvement, project management, administration, hiring, staff development, and building management and procurement.

She is bilingual in English and Spanish.

Prior to assuming her new position, Corinne served as a member of the Board of Directors at the Community Center, where she was also a member of the organization’s Budget and Finance Committee.

"I care deeply for the Cambridge Community Center and I am thrilled to serve as Interim Executive Director," says Espinoza. "Thanks to years of involvement with the CCC, I know the importance of the resources it provides to this community. This is an opportunity to dedicate myself to work that engages my mind, heart and spirit," she says.

"As a member of our Board of Directors, Corinne has been a dedicated and passionate voice in support of the CCC for many years. She has proven to be a strong asset and I look forward to her continued contributions in her new leadership role," said Lindsey Thorne-Bingham, President, CCC Board of Directors.

Located in the Riverside neighborhood of Cambridge, between Central Square and Memorial Drive, the Cambridge Community Center has been serving the community for more than 85 years. Today its mission is to promote community cooperation and unity, and empower youth, individuals and families by offering social, cultural, educational, and recreational activities. Find out more at www.cambridgecc.org/.


Main Street Water Main Lining, Tues, Oct 14 through Thurs, Oct 16 – Night Work

On Tuesday, October 14, crews will begin the process of lining the water main on Main St. from Ames St. to Wadsworth St. The work is being performed at night due to the necessary water shutdowns associated with the lining operation. All impacted properties have been notified.

On Tuesday evening, crews will line the main from Ames St to the Kendall MBTA Station. Ames St. at Main St. will be closed on Tuesday starting at 8pm, and will reopen once crews clear intersection. On Wednesday evening, October 15, crews will line the main from the Kendall MBTA station to Wadsworth St. (Ames St. will be open during this phase). We expect the operation to take two nights to complete, however crews may be onsite Thursday evening if necessary. Work hours on Tuesday and Wednesday will be 6pm to 6am. We don’t anticipate the lining to be noise intensive, however there will be noise from the generators onsite and crews will need to utilize additional lighting.

Please contact us with any questions or concerns regarding this work.

Kelly Dunn
Community Relations Manager, Cambridge Department of Public Works
147 Hampshire Street, Cambridge, MA 02139
T: 617-349-4870 F: 617-349-4814
www.cambridgema.gov/theworks


Affordable Rental and Homeownership Programs Information Session – Monday, October 20

The City of Cambridge will be holding a series of free, Walk-In Informational Sessions on affordable rental and homeownership programs at different locations in the coming months. The next session will be held Monday, Oct 20, from 6-8pm, at the Putnam Gardens Community Room, 64 Magee St., Cambridge. Housing personnel from the Community Development Department will be available to discuss the city’s affordable rental and homeownership programs.

For more information, please contact us at 617-349-4622.


Bicycle and Pedestrian Committees Seeking New Members

Are you interested in transportation infrastructure, education, and safety? The City of Cambridge invites interested persons to apply to become members of the Bicycle or Pedestrian Committees.

City of Cambridge sealBicycle Committee
This committee works to improve conditions for bicyclists in the City of Cambridge and to promote bicycling as a means of transportation. Activities include organizing and participating in public events, such as biannual community bike rides; reviewing plans for road construction; commenting on proposed development projects; creating promotional materials to encourage bicycling in the city; and working with City departments on network planning. This committee generally meets on the second Wednesday of each month from 5:30pm to 7:30pm at the City Hall Annex, 344 Broadway.

Pedestrian Committee
This committee works to promote walking and to help create a more comfortable, safe, and pleasant environment for walking in Cambridge. It advises on the design of roadway projects and policies related to traffic calming, traffic signals, and sidewalk design. It also identifies intersections and other locations where it is difficult to walk, makes suggestions about proposed development projects as they affect people on foot, and undertakes other activities to promote walking. The committee creates and leads fun walking tours for the public. This committee generally meets on the fourth Thursday of each month from 6:00pm to 8:00pm at the City Hall Annex, 344 Broadway. (November and December meetings are on the third Thursday.)

How to Apply
Applications are sought from dedicated individuals who live or work in Cambridge. Members are expected to attend monthly meetings as well as engage in projects outside of regular meetings. To apply, please prepare a cover letter indicating which committee you are interested in, a description of your interest in the topic, and any specific issues you would like to contribute time to working on. Please be sure to include your home mailing address, phone number, and email. Send your application to:

Richard C. Rossi, City Manager
c/o Diane Bongiorno
Community Development Department
344 Broadway, Cambridge, MA 02139
Email: dbongiorno@cambridgema.gov

Application Deadline – Friday, October 31, 2014
Appointments are made by the City Manager and are for two years of service. For more information, call 617/349-4600.

May 22, 2014

Superintendent Jeff Young’s 2011-15 contract requires School Committee renewal before July 6, 2014

Filed under: Cambridge,School Committee,schools — Tags: , , , , — Robert Winters @ 7:00 pm

Superintendent Jeff Young’s 2011-15 contract requires School Committee renewal before July 6, 2014

Superintendent Jeff Young[contributed by Anita D. McClellan and posted on the CPSParents listserv]

Cambridge public school families may be surprised to learn that many school districts open up their Superintendents’ annual evaluation on leadership performance to rating and comments from district parents, teachers, K-12 students, and residents.

In Burlington, MA, District Superintendent Eric Conti’s Blog posts an evaluation survey for 30 days every May so district parents, teachers, K-12 students, and residents can contribute their 2¢ to the School Committee’s evaluation: https://www.surveymonkey.com/s/2014ContiEvaluation.

Dr. Conti also posts the passwords required for anyone to access past years’ Burlington Supt. evaluations and comments: http://ericconti.wordpress.com.

Isn’t it time for Cambridge Public School District – and our 2014 & 2015 School Committee – to emulate Burlington District and to inaugurate PDQ for 2014 an open annual SC evaluation of our Superintendent that takes into account leadership ratings and comments from District parents, teachers, students, and residents?

It would be very quick for 2014 Supt. evaluation to adapt the Burlington Supt. online evaluation survey to CPSD’s needs https://www.surveymonkey.com/s/2014ContiEvaluation so results from Cambridge parents, teachers, students, residents can be factored into the SC’s early July vote on whether or not to renew Dr. Young’s contract through 2018.

After the current contract renewal deadline, the SC can develop its own Supt. online evaluation for the Cambridge public to use in 2015 and thereafter.

Anita McClellan, VL

P.S. Burlington MA District offers a series of District blogs to keep community informed on many educational fronts. Wonderful to have such good communications! Find them on http://ericconti.wordpress.com/ in the righthand column on homepage.

Go here for the Burlington Asst. Supt. of Learning’s blog: http://www.patrickmlarkin.com/

The Burlington District Spec Ed Dept. also surveys public on its performance: https://docs.google.com/forms/d/1l_JgxApXnrmg3QqO_zNW0qDndTQ4t7BmnAEhaZDsxOg/viewform

FYI: Jeff Young has served under School Committee as Superintendent since July 6, 2009. He reports directly to the School Committee. Contract is here: http://rwinters.com/school/JeffYoungContract2011-15.htm

Supt. Duties and Responsibilities.

A. The Superintendent shall diligently, faithfully, professionally and competently perform the duties and responsibilities of the Superintendent of Schools; shall serve as the Chief Executive Officer of the School District, as provided in M.G.L. c. 71, §59 and all other applicable laws and regulations pertaining to public education in Massachusetts; and shall be responsible to direct, organize and manage the school system, in conformity with the requirements of M.G.L. c. 71 and all other applicable federal and state statutes and regulations pertaining to public education, and in conformity with the rules and policy determinations of the Committee. The Superintendent also shall fulfill all of the terms and conditions of this Agreement. The Superintendent shall be the Chief Education Officer of the District.

B. Except as otherwise required by the Superintendent’s duties, the Superintendent shall attend all Committee meetings and shall provide administrative recommendations on each item of business involving the administration of the Public Schools or education matters.

C. The Superintendent recognizes that the proper performance of his duties and responsibilities will require him to work longer than the school day and that his duties and responsibilities are not confined to prescribed hours.

D. The relationship between the Committee and the Superintendent shall be based on a deep commitment to working cooperatively for the benefit of the children and the general community served by the Cambridge Public Schools, and it shall reflect a clear understanding that the Committee is the establishing agent of all school system policy and that the Superintendent has the responsibility to administer said policy in a sound, fair and ethical manner.

E. The Superintendent shall have authority, subject to law and any legally binding contracts of the School District, to organize, reorganize and arrange the administrative and supervisory staff in such a way as, in his best judgment, best serves the School District, subject to approval by the Committee.

F. In its discretion, the Committee will refer to the Superintendent any criticisms, complaints and situations that are brought to its attention and which the Committee deems important enough to warrant the Superintendent’s attention. The Superintendent shall review and make recommendations on any matters referred to him by the Committee.

November 13, 2013

CRLS Alumni Association Project Announces First Annual Alumni Meeting and 2013 Homecoming Events

Filed under: Cambridge,schools — Tags: , — Robert Winters @ 10:54 pm

CRLS Alumni Association Project Announces First Annual Alumni Meeting and 2013 Homecoming Events

Nov 10 – The CRLS Alumni Association Project has been building support for the launch of an Alumni Association for all graduates and staff from Cambridge Rindge & Latin School, Rindge Tech, and Cambridge High & Latin School and has collected over 600 signatures supporting this effort. On Friday, Nov. 29 there will be the First Annual Alumni Association Meeting from 11:00am-12:30pm at CRLS. A interim Alumni Board will be selected. The meeting is open to all graduates and retired staff of CRLS, Rindge Tech, and CHLS. Tours of the renovated high school will also be available before the meeting starting at 10:00am and after starting at12:30pm.

The CRLS Alumni Association Project has also announced a series of Homecoming 2013 Events. All Alumni, staff and families from CRLS, Rindge Tech and CHLS are welcome:

  • Nov 27 – Open House at CRLS from 10:00am to 12 Noon with tours of the new facilities and meeting with Principal Damon Smith
  • Nov 27 – Alumni Reunion Night at Tommy Doyle’s, 8:00pm until closing. Free Hors D’oeuvres from 8-10:00pm. Cash Bar. All classes, all schools and guests welcome! Tommy Doyle’s, 96 Winthrop Street
  • Nov 28 – Pre-game Tailgate and Football Game vs. Somerville. Hospitality starts at 8:30am. Kickoff at 10:00am at Russell Field
  • Dec 6 – The Fall Musical "Rag Time" at 7:00pm. Alumni are encouraged to attend the Friday night performance at the CRLS Fitzgerald Theater. Reception immediately following performance in the Media Café at CRLS.

Please register for events (most are free) at: crlshomecoming2013.eventbrite.com. For more information about any of these events please contact Andy Farrar at 978-764-7566/af@handsontoys.com or David Vogel at davidgvogel@yahoo.com.

October 28, 2013

School Committee Candidates Respond to PANGEA Questions

Filed under: 2013 Election,Cambridge,elections,School Committee — Tags: , , — Robert Winters @ 12:04 pm

P A N G E A
Parents for a Global Education Association

Dear Cambridge Families,

Six of the nine (6 of 9) School Committee candidates participated in our forum on World Languages: Fran Cronin, Alfred Fantini, John Holland, Elechi Kadete, Patricia Nolan, and Mervan Osborne. One (1) candidate responded that she was a strong advocate for world languages, but was not able to answer the questions: Joyce Gerber. Two (2) candidates did not respond: Richard Harding and Kathleen Kelly.

We are grateful to have received responses from 6 candidates. We have enclosed these here in alphabetical order.

You can also find them on PANGEA’s website under latest updates: www.pangeacambridge.com

We have reached out to all the candidates and are hopeful that other responses will soon follow. If you know any of the candidates who have not responded and desire to hear their opinions on these issues, we’d encourage you to reach out to them and ask for their responses.

When we receive further responses, we will forward them along.

Sincerely,
Paul Ciampa, PANGEA member
Jane Chiang, PANGEA member

Fran Cronin responses (2 pg. PDF)

Fred Fantini responses (6 pg. PDF)

John Holland responses (4 pg. PDF)

Elechi Kadete responses (5 pg. PDF)

Patricia Nolan responses (11 pg. PDF)

Mervan Osborne responses (2 pg. PDF)

PANGEA is an organization of parents and community members advocating for the development, support, and promotion of language immersion programs in Cambridge for all children. We believe that effective cross-cultural and communication skills are integral to a global education. Language immersion programs are one way to fill that need. Strong world language programs can also provide these skills. Families should have the option of choosing the model that best fits their circumstances.

September 26, 2013

PANGEA request for questions to be directed to Cambridge School Committee candidates

Filed under: 2013 Election,Cambridge,School Committee — Tags: , , , — Robert Winters @ 10:01 am

Sept 26 – PANGEA (Parents for a Global Education Association), a new parent group, has made the following request for questions to be directed to Cambridge School Committee candidates. They would like to get questions no later than Oct 7 and plan to publicize candidate responses by Oct 24. (Questions can be sent to info@pangeacambridge.com):

Dear Cambridge Families,
We feel that world languages are an important part of an elementary education. Over the past few years, there has been a vigorous debate around exactly what type of language instruction the City will provide. Given the upcoming election, we feel that it is important to ask specific questions of the candidates and request their written responses. To this end, we are reaching out to the Cambridge community to see what questions they’d like to ask the candidates for School Committee on this issue. If you have a question you’d like to ask, please email us at info@pangeacambridge.com or send us a letter in the mail to: Jane Chiang, 245 First Street, Suite 1800-18020113, Cambridge, MA 02142

ALL QUESTIONS NEED TO BE IN OUR HANDS BY OCTOBER 7 TO BE CONSIDERED FOR INCLUSION.

We will read through these questions, and from these responses, send a list of questions to the candidates. We will then aggregate their responses, send them to the broader Cambridge community, and post them on PANGEA’s website: www.pangeacambridge.com.

We’d note that not every question sent to us may be submitted to the candidates. We will attempt to capture the key themes/questions that reflect the community as a whole.

Thank you.
Paul Ciampa, PANGEA member
Jane Chiang, PANGEA member

PANGEA (Parents for a Global Education Association) is an organization of parents and community members advocating for the development, support, and promotion of language immersion programs based on best practices in Cambridge for all children. We believe that effective cross-cultural and communication skills are integral to a global education. Language immersion programs are one way to fill that need. Strong world language programs can also provide these skills.

September 18, 2013

Episode 4 of Cambridge InsideOut – Big Issues in the 2013 School Committee election

Filed under: 2013 Election,Cambridge,elections,School Committee,schools — Tags: , , , — Robert Winters @ 4:30 pm

Episode 4 of Cambridge InsideOut – Big Issues in the 2013 School Committee election.
This episode aired on Sept 17, 2013.

June 17, 2013

MLK School Groundbreaking – June 17, 2013

Filed under: Cambridge,schools — Tags: , — Robert Winters @ 5:10 pm

MLK School Groundbreaking

June 17, 2013 – City and School Officials held a groundbreaking ceremony for the new Dr. Martin Luther King, Jr. Elementary School & Putnam Avenue Upper School Monday, June 17. The existing structure at 100 Putnam Ave., Cambridge will be replaced with a new energy efficient NET ZERO building design. The final construction phase shall begin following final project bids due in December 2013 and occupancy is scheduled for September 2015.

June 13, 2013

Dr. Martin Luther King, Jr. Elementary School & Putnam Avenue Upper School Groundbreaking Ceremony – Monday, June 17 at noon

Filed under: Cambridge,schools — Tags: — Robert Winters @ 12:41 am

Cambridge, MA — The City of Cambridge will hold a groundbreaking ceremony for Dr. Martin Luther King, Jr. Elementary School & Putnam Avenue Upper School Monday, June 17, at 12:00pm, 100 Putnam Ave. (rear), Cambridge.
Note on Directions: Please access site from Kinnaird St. or Hayes St. only. Please do not use Magee St. This is an active construction site so please stay inside marked barriers for your safety.

Project Background
In July 2012, the city’s project architect, Perkins Eastman, presented City officials with its Feasibility Study for the new Dr. Martin Luther King Jr. Construction Project. Three options were considered and the final decision was to replace the existing structure with a new energy efficient NET ZERO building design. During the design phases, the occupants participated in the building programming, which included education of what a NET ZERO design consists of, and why their actions when using the building will help control the energy consumption. This design is scheduled to be completed for bid in early Fall 2013.

The Construction Manager at Risk, the Rich-Caulfield Venture, began abatement of hazardous materials and demolition in April 2013. These activities should be completed by the end of October 2013. The construction start date for the foundations, steel and geothermal wells is anticipated for early Fall 2013. The final construction phase shall begin following final project bids due in December 2013 and occupancy is scheduled for September 2015. The present total project costs approved by the City Council in September 2012 was $84,550,000. Design features of the 187,000 square foot building and indoor parking garage include:

  • Geothermal Wells which extract heat from the ground thus helping keep energy costs low;
  • Daylight Harvesting which includes glass and other design elements that enable natural light to pass through the building;
  • Automatic Lighting Dimmer System which helps conserve energy use;
  • Gray Water Storage System which helps conserve water use;
  • 30 kBtu/sf/year which describes the building’s energy use and efficiency performance. The average K-12 school in America has an efficiency rating of 169 kBtu/sf/year. This design goal of 30 kBtu/sf/year means the new school will be 82% more efficient than the average American school.

The school will contain all new facilities and equipment for its classrooms, library, auditorium, gymnasium, community rooms, new outdoor play space and improved parking. For project updates, visit the Martin Luther King Construction Project Webpage, http://www.cambridgema.gov/cmanager/mlkjrschoolconstruction.aspx.

« Newer PostsOlder Posts »

Powered by WordPress