Cambridge Civic Journal Forum

June 24, 2014

Starts and Stops, mostly stops

I’m commenting on the “Starts and Stops” article which appeared in the Boston Globe on Sunday, June 22, 2014.

That’s behind a paywall. You may need to log in as a Globe subscriber to see it. (I’m one, but if I recall correctly, there’s a limited number of views till the paywall descends). You can also log in from home in the Boston area using a library card number.

The Globe article describes a bicycle-specific traffic signal on Western Avenue and makes the claim:

The Western Avenue signal is timed so that cyclists get a green light a few moments before their vehicular counterparts headed toward Memorial Drive; that way, cyclists have several seconds of a head start to get out ahead of the cars and become more visible to motorists, especially motorists turning right who may not think to look for cyclists approaching on their right side.

That only works if bicyclists happen to be waiting when the light changes. Otherwise, according to the description in the article, there is a right-hook conflict, with motor vehicles turning right across the path of bicyclists approaching in their right rear blindspot. I haven’t checked out the installation yet; I’ll be back in a couple of weeks with more detail.

The article goes on to say:

Additionally, signals like this one address one of the biggest gripes motorists have with bike riders: that they’re constantly running red lights. For cyclists, there can be no confusion whether they’re expected to stop at a red light when that light shows a little bicycle. Many engineers believe that when cyclists are assured that a traffic light is targeted at them and designed to protect their safety, they’re much more likely to wait for their rightful turn to proceed through the intersection.

Here’s the photo which the Globe posted with the article.

New bicycle-specific traffic light on Western Avenue

New bicycle-specific traffic light on Western Avenue

Wishful thinking. Normal traffic lights also apply to bicyclists. Do we need our own very special, and eexpensive, signal just so we will feel pampered? The traffic light shown in the photo, by the way, isn’t at Memorial Drive. It is at Putnam Avenue, a block earlier. Because the photo doesn’t show the installation which the article describes, I’m not entirely clear about the details.

It was previously possible for bicyclists to approach Memorial Drive in the through lane and enter on the normal green light — or sensibly, though in violation of the specifics of traffic law, at the left side of a right-turn lane lane, and also enter on the normal green. Now, bicyclists and right-turning motorists are, at least as described in the article, forced into a right-hook conflict.

Please, who are the unattributed “many engineers”? Opportunistic bicyclists and pedestrians, motorists too — commit traffic-signal violations because they get annoyed with waiting. Compliance improves if a traffic-light system is designed to minimize waiting time. This one doesn’t, and right-hook conflicts don’t protect anyone’s safety.

I am about to attend the summer meeting of the National Committee on Uniform Traffic Control Devices (NCUTCD), where I sit on its Bicycle Technical Committee. Two proposals currently before the Committee, in experimental status, are special bicycle traffic signals, and right-turn lanes with a bicycle lane inside their left side. I would have hoped that Cambridge had submitted a formal Request to Experiment from Cambridge for either of these proposals — which would add to the knowledge base, and confer immunity from legal liability — but I’ve seen none. I should have. The Federal Highway Administration calls on the NCUTCD to review them.

Oh, and also — in the Globe’s photo, it looks as though a car is sitting in the bikeway.

More to come.

Save

Save

February 13, 2014

MBTA Role in Cambridge Center Project – Kendall Station Urban Initiatives Project, 1979-1989

MBTA Role in Jump-starting Development of the Cambridge Center Project
Kendall Station Urban Initiatives Project, 1979-1989

By Thad Tercyak, Cambridge Redevelopment Authority, Associate Director, 1968-1990

The purpose of this narrative is to provide additional information about the Cambridge Redevelopment Authority’s (CRA) Kendall Square Urban Renewal Project and to describe the role of the Massachusetts Bay Transportation Authority (MBTA) and the U.S. Dept. of Transportation, Urban Mass Transportation Administration (UMTA) in helping to jump-start development of the CRA’s Cambridge Center Project in 1979-1989, a major factor in helping to attract high-tech companies to locate in the East Cambridge industrial area. UMTA provided the MBTA with critical financial assistance made available under President Carter’s Urban Initiatives Program.

Kendall Urban Initiatives Project 1980
KENDALL SQUARE URBAN RENEWAL PROJECT
Urban Initiatives Project – 1980

To understand the Kendall Square Urban Renewal Project, it must be divided into two phases:

Phase 1. 1963-1979. The objective was to transform a 43-acre blighted urban industrial area into vacant land for construction of improvements.
Background. The Kendall Square Urban Redevelopment Project planning activities during Phase 1 included creating, initiating and financing the Kendall Square Urban Renewal Project; preparing an urban renewal plan to accommodate development by the National Aeronautics and Space Administration (NASA); and, after NASA withdrew from the Project, preparing an entirely new plan for development by private developers; a painful, prolonged and laborious process because Cambridge was unprepared to carry out the difficult and complicated tasks involved in overhauling the original plan with an entirely new plan.

In 1965, when the City of Cambridge approved the CRA’s original Kendall Square Urban Renewal Project, it anticipated that the Project would attract NASA-related private development to replace a blighted industrial area of old, deteriorated and underutilized buildings with a modern, attractive industrial area which would generate tax revenues and jobs. In 1970, when NASA withdrew from the Kendall Square Urban Renewal Project and transferred its interests in the Kendall Square Project to the U.S. Department of Transportation (DOT), the feeling in Cambridge was that the project had been delivered a tremendous setback because it lost its major developer; a severe blow to the city’s efforts to expand its economic base.

The 1970-77 period involved two major activities:
(1) The execution of land preparation activities in order to transform a 43-acre industrial slum into vacant land for new construction. The activities required the acquisition of 70 parcels of land, relocation of the Broad Canal to an underground water system, relocation of nearly 100 businesses, demolition of 50 buildings, construction of infrastructure, and formation of new traffic patterns of circulation. Land preparation activities are the "nitty-gritty, heavy-lifting" period of the redevelopment process because most are messy, noisy, a public nuisance and a favorite subject of complaint.

(2) The resolution of planning issues in order to amend the Kendall Square Urban Renewal Plan to designate new reuses for the land. Activities included negotiations between the CRA, DOT, and the U.S. General Services Administration to retrieve the rights to develop 10 acres of vacant land left behind by NASA; and rejection by the Cambridge City Council of four redevelopment plans prepared by a task force comprised of representatives from a cross section of Cambridge organizations working with the CRA.

In 1976, the CRA engaged the Urban Land Institute’s (ULI) advisory panel services to review the Kendall Square Project and propose ways to help break the multi-year planning deadlock. Among the "Findings, Conclusions, and Recommendations" of the ULI panel:

• Only a few properties in the country have a broader array of locational advantages as the Kendall Square area and the opportunities associated with the Kendall Square Urban Renewal Project: Cambridge Center is a unique opportunity area, one that should be reserved to maximize its locational advantages.

The MBTA’s Kendall Station subway is one of the more spectacular assets affecting the redevelopment potential of the CRA’s Cambridge Center project (emphasis added).

• Attracting developers will not be easy. Citizen concerns, political pressure, economic uncertainty, the absence of a united and strong development process, high taxes, environmental constraints, contentious political climate, and congested surface transportation have combined to create a credibility problem with the real estate development community relative to the City of Cambridge. With few exceptions, the lack of credibility has been a severe restraint to real estate development in Cambridge.

These development problems are such that all but the most determined developer, the one who perceives a very close relationship between locational advantages and development opportunities, will be deterred from coming into the community (emphasis added).

Engaging the ULI greatly helped to break the planning deadlock because the panel’s expertise gained the confidence of the Cambridge City Council and the CRA. The panel advised the CRA to make extraordinary efforts to impress potential developers by efficiently completing site preparations and all major pre-physical development activities. The CRA responded by removing legal and technical impediments to development by completing an Environmental Impact Statement; securing plan and zoning amendments; carrying out a $7-million public improvements program; and implementing traffic circulation plans, such as widening Binney Street to provide direct major access to Memorial Drive.

In 1977, Cambridge City Council approved a mixed-use development plan for the Kendall Square Urban Renewal Project. For marketing purposes the name Cambridge Center was adopted to refer to the 24 acres in the Kendall Square Project Area separate from the land occupied by DOT. In 1978, the CRA invited proposals to develop Cambridge Center, and in 1979, selected Boston Properties as the initial developer.

Phase 2. 1980-Present. The objective was to sell the vacant land created during Phase 1 for private development.
The CRA and Boston Properties executed a Development Agreement which provided that the CRA would sell land to Boston Properties in stages after approval of development plans; and Boston Properties was required to start construction of an office building within seven months of signing the agreement.

Because of the disorderly events of the 1970’s, expectations regarding development of the CRA’s Kendall Square Urban Renewal Project were gloomy. Mortimer Zuckerman, one of the two Boston Properties principals, was aware of the difficulties: "It was a very bleak time when the Kennedy Space Center moved to Texas…There was just a lot of land there" (Woolhouse, "Making a High Tech Mecca", Boston Globe, June 26, 2011)".

The CRA realized that to overcome Cambridge’s credibility problem with the real estate community, it had to establish a reputation for being able to work efficiently and effectively with Boston Properties in stimulating private development of the Cambridge Center Project. The MBTA was about to provide the CRA with the opportunity to establish that reputation.

The MBTA operated three facilities in the Kendall Square Urban Renewal Project area: the Kendall subway station (Kendall Station), bus layover facilities, and a traction power substation. The Kendall Station was old (built in 1912), dilapidated, obsolete, with dimly lighted platforms. The traction power substation was considered to be obsolete and a blighting influence, and its 50′ high fire-damaged brick facade dominated the heavily travelled Main Street eastern entrance to the Kendall Square area.

The MBTA recognized that because of the improvements designated for the CRA’s Kendall Square Urban Renewal Project, the MBTA facilities would have to be modernized. During the mid-1970’s, the MBTA and the CRA staffs met to coordinate plans regarding future reconstruction efforts. It was decided that reconstruction would be integrated with the CRA’s redevelopment activities, and the CRA’s Concept Design Plan for the Kendall Square Project would be used as the standard for urban design amenities.

By coincidence, Jimmy Carter was the U.S President from 1977 to 1981, and his Urban Policy plans included shifting the allocation of federal resources to favor urban areas. Priority was to be given to projects that leveraged the expenditure of federal funds and strong incentives would be awarded to projects engaged in efforts to attract private investments to urban areas. The effort would be called the President’s Urban Initiatives Program.

Kendall Station Urban Initiatives Project
The MBTA determined that its Kendall Station met the qualifications to receive designation as a Urban Initiatives Project because it was already integrating its plans for modernizing the Kendall Station with the CRA’s plans for the Kendall Square Urban Renewal Project, and that the CRA had executed a Development Agreement with Boston Properties to attract private development and investments to the Cambridge Center Project. In its application to UMTA for project approval, the MBTA made the following points:

"The project’s financial assistance will be used to provide Kendall Station improvements in support of a major urban redevelopment effort and to stimulate private investments for urban improvements… The CRA has designated Boston Properties as developer for Cambridge Center and Boston Properties is expected to generate $150 million of private investment over the next 10 years and produce in excess of one-million square feet of office, hotel, retail, and open space. More immediately, Boston Properties is prepared to begin construction in October, 1979, of the first office building (13 stories) involving 250,000 square feet of space and costing approximately $20 million. This initial investment could be followed the next year with a second building of the same magnitude".

UMTA designated the Kendall Station project as an Urban Initiatives Project, agreeing that "the proposal has excellent characteristics for effectively achieving the President’s intentions in calling for an UMTA Urban Initiatives Program". The Kendall Station Urban Initiatives Project involved the CRA, the MBTA, and Boston Properties. It included Parcel 4 of the Kendall Square Urban Renewal Project, a triangular 5-acre site bordered by Main Street, Broadway and Sixth Street around the Kendall Station.

Initially, because of budgetary constraints, the MBTA programmed construction of the Kendall Station improvements for the late-1980’s and called for only a modest renovation of the existing facilities and entrances; and the program for the traction power substation provided only for replacement of electrical equipment, with no provision for replacing and relocating the building. This schedule was of grave concern to the CRA because the Kendall Station, in its present antiquated condition, would have an adverse effect on the initial marketing efforts by Boston Properties to attract private development to the area.

At that time, Boston Properties marketing efforts highlighted the locational advantages of the Kendall Station: (1) The MIT campus was in the immediate neighborhood. (2) Two subway stops easterly from the Kendall Station was downtown Boston, and two subway stops westerly was Harvard University. (3) The MBTA public transit system provided access to virtually the entire Boston Metropolitan Area. (4) The Kendall Station was within easy walking distance of any location within the Cambridge Center Project area. The CRA believed that an efficient and timely transformation of the Kendall Station from old, dilapidated and obsolete to a modern, attractive, and well-designed subway station, and the simultaneous construction of buildings by Boston Properties and public improvements by the CRA could have a dramatic positive effect on Boston Properties’ marketing efforts. Also it could stimulate private development of the vacant land in the rest of Cambridge Center; and might influence the real estate community’s perception of Cambridge’s credibility.

The CRA requested (1) the MBTA reschedule construction of the Kendall Station to start during the early 1980’s, and the proposed station improvements be upgraded to match the CRA’s design standards; and (2) the traction power substation be replaced and relocated so that it could be subsumed within the private development occurring on-site. The MBTA was supportive, but because the MBTA system had operated at a loss during the past five years, it had determined that "no part of the costs associated with the Kendall Station Urban Initiatives Project can be financed from MBTA revenue".

Designation of the Kendall Station modernization plans as an UMTA Urban Initiatives Project also qualified the MBTA for the maximum amount of Federal assistance, making it eligible to receive funding from UMTA. Accordingly, UMTA provided the critical financing the MBTA needed to reschedule construction of the Kendall Station to begin sooner, upgrade design standards, and relocate the new traction power substation.

Then a rare event took place in the City of Cambridge. Two public agencies – the CRA and the MBTA – and a private developer – Boston Properties – initiated meetings to discuss the funding, design and construction details of the Kendall Station Urban Initiatives Project. They entered into a variety of formal and informal arrangements to cooperate in the planning and development around the Kendall Station. Their arrangements extended from land use planning and urban design to land acquisition and transfer policies, construction activities, and the maintenance of public and private improvements. For example:

• The Kendall Station modernization would include lengthening the subway platforms from four cars to six cars, relocating the stations entrances, and upgrading the stations interiors.

• The MBTA’s new traction power substation would be integrated with the improvements planned by the CRA and Boston Properties.

• The CRA’s design standards for the renewal area would be used to plan project improvements related to the Kendall Station reconstruction.

• The CRA was awarded a $5.1-million grant to provide transit-related improvements and urban design amenities, including street and sidewalk improvements, a bus contraflow lane, a Transit Plaza, an urban park at the gateway to the project, and pedestrian connections to nearby neighborhoods.

Urban Initiatives Project Area - 1980

Construction Coordination
A particularly difficult task was the coordination of simultaneous construction activities by the three entities in performing over- lapping construction work within tight, limited areas where the lines of responsibilities were difficult to draw. The parties devised a cost-sharing formula to determine how much of the total cost would be the responsibility of each party if the entire job was performed by a single contractor. A contractor would then be engaged and each party would pay its agreed-upon share of the total contractor cost. For example:

• The MBTA dug a huge excavation across Main Street and abutting vacant land. The excavation was for the expansion and renovation of the Kendall Station (to be constructed by the MBTA); and for an area to provide services to the buildings on Parcel 4 (to be built by Boston Properties). The building service area was to be located under a Transit Plaza (to be built by the CRA) so that it would be out-of-sight.

• The new northerly entrance to the subway (to be built by the MBTA) would abut the Transit Plaza (to be built by the CRA) and include an extended canopy from the wall of an office building (to be built by Boston Properties). The canopy would provide the MBTA patrons with a covered walkway and direct access to a food court (to be built by Boston Properties).

• The three parties collaborated on the location and design of the new traction power substation (to be built by the MBTA) so that a 12-story office building (to be built by Boston Properties) could be constructed on air rights over it.

• As construction was completed by the MBTA and Boston Properties, the CRA was to construct public improvements in the abutting public ways.

The redevelopment of Parcel 4 was a team effort by the CRA, the MBTA, and Boston Properties. The renovations by the MBTA in modernizing the Kendall Station, and by the CRA in constructing public improvements and urban design amenities, created an environment to reinforce Boston Properties’ marketing efforts to attract highly-qualified companies to locate in the Cambridge Center Project.

Kendall Station - Urban Initiatives Project - 1985
KENDALL STATION
Urban Initiatives Project – 1985

Urban Initiatives Project Area - 1985
Urban Initiatives Project Area – 1985
Construction Coordination

Urban Initiatives Project Area - 1989
Urban Initiatives Project Area – 1989

Transit Plaza contributions
The Transit Plaza, named Nowiszewski Plaza, abutted the Kendall Station’s exit/access, and was surrounded by active uses. It included a multicolored paving pattern, and a 75-foot sculptured tower, which also served as an emergency exit for the hotel, ventilation for the building service area under the Plaza, and amphitheater seating. Boston Properties funded the tower and the gold-leaf octahedron adorning its top, and was obliged to operate, maintain, and repair the Transit Plaza.

(NOTE: The Transit Plaza was subsequently modified.)

Urban Initiatives Project - 1989
Urban Initiatives Project – 1989

Pedestrian Circulation
Efforts were made to facilitate pedestrian circulation and activities: 5 Cambridge Center contained Legal Seafood restaurant; 3 Cambridge Center had a food court and MIT Coop store; and 2 Cambridge Center, a hotel abutting the Transit Plaza, had a restaurant, bar, and a public easement through the hotel lobby connecting to a pedestrian way to the surrounding area. The Transit Plaza provided exit/access for the subway, outdoor use of tables and chairs, amphitheater seating, and occasional entertainment programs, fairs and informal performances by free-lancers. Directly east of 1 Cambridge Center was an urban park, "Galaxy at Murphy Park". Also, Boston Properties constructed an elevator-accessible 1-acre public park on the roof of a parking garage. (Note: The garage roof was subsequently modified.)

"Galaxy at Murphy Park"
The eastern gateway to the Kendall Square area at the intersection of Main Street and Broadway, was a triangular site used to construct "Galaxy at Murphy Park". Galaxy was conceived through the successful collaborative efforts of the CRA and the MIT Center for Advanced Visual Studies.

The CRA considered Galaxy to be one of the most attractive features of Cambridge Center.

The centerpiece of Galaxy was an environmental structure which featured a 5-foot-in-diameter "earthsphere" placed in a fountain. Water spray – during the warm months – , or steam – during the cold months – enveloped the sphere to create the appearance of "floating" on clouds. Surrounding the fountain were 12" moon-globes which were perforated in individual patterns. At nighttime, the globes were illuminated from within and its shadows cast light and patterns on the pavement around the globes; and when steam from the earthsphere passed over the globes, rays of light were visible coming through the perforations. Surrounding the fountain were benches for sitting; two rows of trees and shrubs; and grassy open spaces.

Boston Properties was responsible for operating, maintaining and repairing "Galaxy".

Urban Initiatives Project 1989
Urban Initiatives Project 1989

Urban Initiatives Project 1989

National Association of Housing and Redevelopment Officials (NAHRO)
In 1990, NAHRO’s Annual Agency Awards of Excellence in Housing and Community Development chose the Kendall Station Urban Initiatives Project for its Administrative Innovation Award. "The Kendall Square Project showed excellent coordination of public and private funding, as well as excellent planning and team work by three major agencies over the 10-year development period. A joint development carried out among two public agencies, the CRA and the MBTA, and a private developer, Boston Properties".

Summary
Although the project was complex, the objectives of the Kendall Station Urban Initiatives Project were achieved:

• The MBTA modernized and expanded the Kendall Station by relocating station entrances, lengthening the station platforms, and renovating the station’s interiors; and constructed a new traction power substation to replace the old, outmoded one.

• Boston Properties marketing operations attracted qualified competent companies to locate within the Urban Initiatives Project area, resulting in the construction of 1.1-million square feet of mixed-used development, including two 12- to 13- story retail, office buildings; a 13-story office building constructed on air rights over the MBTA traction power substation; a 25-story hotel; a 4-story retail, office building; and a 863-car garage with a one-acre open space roof–top garden.

• The CRA constructed public improvements throughout the area: streets and sidewalks, landscaping, Transit Plaza, Galaxy park, and pedestrian walkways.

• UMTA provided the critical financing the MBTA needed to reschedule and upgrade its Kendall Station facilities. UMTA considered the Kendall Station Project to be a successful Urban Initiatives Project because it attracted private investments to the Cambridge urban area, and "a model for other cities on the positive impact that transit accessibility can have on community development".

• The joint public-private cooperative effort helped to create an environment that supported Boston Properties’ marketing operations and provided a jump-start to generate momentum to develop Parcel 4.

In 1979, when the MBTA submitted its application for Kendall Station designation as an Urban Initiatives Project, the CRA’s expectations were that the Cambridge Center Project would be completed in about ten years and produce 1.7-million square feet of mixed-use development and generate $200-million of private investments. Thirty years later, the Cambridge Center Project is in its last phase, and upon completion is projected to have produced 3-million square feet of mixed-uses, and generated about $1-billion of private investments, $15-million of property tax revenues and about 6,000 jobs.

The joint public-private team enterprise in the successful redevelopment of Parcel 4 was a factor in the real estate development community’s apparent re-evaluation of its skepticism about the development climate in the City of Cambridge. Starting in the 1980’s, private investments were made to develop the rest of the Cambridge Center Project, and subsequently a flood of development occurred in the East Cambridge industrial area.

END

P.S.: Robert F. Rowland was the CRA Executive Director in the 1970’s when planning to integrate the CRA’s and MBTA’s urban redevelopment operations in the Kendall Square Urban Renewal Project were initiated, and which resulted in the designation of the Kendall Station as an Urban Initiatives Project.


Thad J. Tercyak Professional Resume
1610 N Pebble Beach Blvd., Sun City Center, FL 33573; Phone (813) 633-5746 (Nov-May)
108 Alden Village Ct., Cary, NC 27519; Phone (919) 460-4526 (June-Oct)
E-Mail: tedtercyak AT cs DOT com

Professional Employment
Cambridge Redevelopment Authority: Associate Director, 1968-1990.
Boston Redevelopment Authority: Project Director, Washington Park and South End urban renewal projects; 1961-1968.
Cuyahoga County Planning Authority (Cleveland, Ohio): Economist, 1957-1960.
Connecticut Development Commission (Adams, Howard & Greeley, City Planning Consultants): Economist, 1956-1957.

Academic
University of Pittsburgh: Master’s Degree, Public Administration, 1961.
University of Connecticut: Master’s Degree, Economics, 1956.
Boston University Metropolitan College: Part-time Instructor, Urban Renewal, 1975-6.

Publications

Cambridge Civic Journal:
"Kendall Square Urban Renewal Project: Six Pivotal Episodes"; June, 2013.
"Kendall Square Urban Renewal Project, Initial Years, 1963 to 1982"; July, 2012.

Urban Land Institute:
"Joint Development at Kendall Square"; April, 1991.
"Marketing Public Land"; February, 1986.
"Cambridge Center Project Design"; April, 1985.
"Panel Revisits: Cambridge Center: Downtown Redevelopment"; February, 1985.

Journal of Housing:
"Project Design: A Cooperative Effort"; September/October, 1984.
"Kendall Square: An Urban Renewal Success"; September/October, 1982.

Urban Land Institute (ULI) , Advisory Services Panelist:
An Evaluation of the Development Potential and Revitalization Strategy for the Silver Triangle Site, Downtown Silver Spring, Maryland, 1992.
An Evaluation of Kennedy and LaGuardia Airport Access for the Port Authority of New York and New Jersey, the Metropolitan Transportation Authority and the City of New York, 1991

Professional Resume, summary
Mr. Tercyak’s professional background includes Master’s degrees in Economics and Public Administration; 22 years as Associate Director of the Cambridge Redevelopment Authority; 7 years as project director of the Boston Redevelopment Authority’s Washington Park and South End urban renewal projects; 5 years as an economist with city and county planning agencies; and Urban Land Institute advisory services panelist evaluating potential development projects for the Port Authority of New York and New Jersey, and for downtown Silver Spring, Maryland. Several articles published in the Cambridge Civic Journal, Urban Land Institute Magazine and Journal of Housing. Part-time instructor, Community Development, Boston University Metropolitan College.

December 31, 2013

K2C2 Final Reports Released

Filed under: Cambridge,Central Square,Kendall Square,planning — Tags: , , — Robert Winters @ 10:58 am

K2C2 Final Reports Released

K2C2 areaThe final reports for Kendall Square and Central Square are now available for download. Zoning discussions based on the recommendations of the K2 and C2 Advisory Committees, which are encapsulated in these reports, will continue in 2014.

Community Development Department

Kendall Square Central Square Planning Study (K2C2)

Central Square Final Report 2013 Part 1, December 2013

Central Square Final Report 2013 Part 2, December 2013

Kendall Square Final Report 2013 Part 1, December 2013

Kendall Square Final Report 2013 Part 2, December 2013

This comprehensive planning effort guided by stakeholder advisory committees, City staff, and a team of multidisciplinary consultants led by Goody Clancy, developed a vision and master plan for Central Square, Kendall Square, and the area South of Main Street (including the Osborn Triangle) connecting the two squares. Both final reports are divided into two parts; in each case you will need to review both parts to read the entire report.

October 27, 2013

A Better Cambridge (ABC) Grades the City Council Candidates

Filed under: 2013 Election,Cambridge,City Council,elections,planning — Tags: , , — Robert Winters @ 8:53 pm

"A Better Cambridge" (ABC) Grades the City Council Candidates

ABC Scorecard
Leland Cheung 10
Marc McGovern 10
Sam Seidel 8.5
Denise Simmons 8.5
Janneke House 8
Ken Reeves 8
Tim Toomey 8
Kristen von Hoffmann   8
Craig Kelley 6
Dennis Benzan 5.5
Mushtaque Mirza 5.5
Minka vanBeuzekom 5
James Lee 3
Nadeem Mazen 2
Luis Vasquez 1
Gary Mello 1
Dennis Carlone 0.5
Ronald Peden 0

Oct 26 – "A Better Cambridge" (ABC), the Cambridge resident group that describes itself as "working to build a more diverse and livable city on the path towards sustainable growth," has released the results of its 2013 City Council Candidate ratings. Since its inception, ABC has been a consistent supporter of the planning principles of "smart growth" and transit-oriented development, especially housing for a broad spectrum of incomes. Of the 18 City Council candidates who responded to the group’s questionnaire, top scores went to Leland Cheung and Marc McGovern, and lowest scores went to Dennis Carlone and Ron Peden.

"A Better Cambridge looks forward to working with all 9 members of the next City Council to help build a more diverse and livable city," said ABC chairman Jesse Kanson-Benanav. He added: "We believe a better Cambridge is a Cambridge that grows smart and sustainably, taking advantage of Cambridge’s proximity to public and alternate transportation to expand housing choices for all Cambridge families." The full ABC mission and vision may be viewed at http://www.abettercambridge.org/our_mission.

ABC’s analysis, including charts listing the candidate ratings on the individual question plus summary analyses of each candidate’s positions, may be found at the ABC website: http://www.abettercambridge.org.

The group’s press release noted that its candidate questionnaire and analysis is intended to give information about how the various candidates stand on the issues that ABC has focused on and is not intended to be an exhaustive analysis of their stance on every issue currently facing Cambridge.

ABC’s Candidate Grid (2 page PDF)     ABC’s Candidate Analysis (56 page PDF)

The ABC questions/topics posed to the candidates were:

  • DIVERSITY: If elected, what policies will you support or propose to help strengthen the diversity of our community through increased affordable housing and greater economic opportunity for all Cambridge residents?
  • SUSTAINABILITY: If elected, what policies or initiatives will you support to ensure that there is adequate housing near public transportation that supports sufficient retail to meet neighborhood needs, meets the needs of current and future residents, reduces auto usage and encourages energy efficiency?
  • GROWTH: Do you agree that in order to support diversity and meet the housing needs of sustainable growth in Cambridge increased density may be necessary? If elected, what specific policies or initiatives will you support to achieve sustainable urban growth and to increase low and moderate income housing for all populations, including families?
  • LIVABILITY: What traits of Cambridge neighborhoods do you find most distinctive? If elected, what policies or initiatives will you support to help reinforce these characteristics through new development, public and open spaces and other means?
  • DIALOGUE: In your opinion, do public planning processes in Cambridge support open and constructive engagement between stakeholders? If elected, how will you help ensure transparent and mutually respectful planning for the future of Cambridge?
  • K2C2: Which three K2C2 recommendations do you believe should be top priorities for the City of Cambridge over the next few years? What specific policies or initiatives recommended will you support to ensure these priorities are achieved during the next City Council term? Are there policies and recommendations that you oppose?
  • CONNOLLY "NET ZERO" PETITION: Does this candidate oppose the Connolly Petition?
  • BUILDING HEIGHTS: Does this candidate support the possibility of increased height allowances for certain transit-­oriented developments?
  • MORATORIUM ON NEW DEVELOPMENT: Does this candidate oppose a moratorium on development?
  • CITYWIDE MASTER PLAN: Does this candidate oppose a master planning process that freezes smart growth projects?

October 6, 2013

Cambridge at cross purposes about traffic

Readers of the newsletter of the Belmont Citizens Forum will find much news there about neighboring North Cambridge. Editor Meg Muckenhoupt’s lead story in the September-October 2013 issue is about major, new housing developments planned for the part of Cambridge west of Alewife Brook Parkway and north of Fresh Pond Park. The article expresses concerns with traffic which is already approaching gridlock and affecting access to the Alewife T station.

Quoting from the story:

The decision document issued by Cambridge’s Planning Board for the 398-unit 160 Cambridgepark Drive, which is predicted to cause 1,324 new trips, states, “The project is expected to have minimal impact on traffic and will not cause congestion, hazard, or substantial change to the established neighborhood character.” Ominously, the decision continues: “It is also noted that the traffic generated by the project is anticipated to be less than that associated with the office/research and development project on 150, 180 and 180R Cambridgepark Drive for which entitlements currently exist under a previously granted special permit.” In short, if the city of Cambridge accepted a potential increase in traffic for a special permit in the past, the city should accept that increase in traffic for all future permits—no matter how much the population has increased in the meantime.

[…]

Concord Avenue and the Alewife Brook Parkway rotary won’t escape traffic woes. Cambridge’s 2005 Concord Alewife Plan included a “critical movement analysis” of the area. Critical movements are conflicting traffic movements. They are the times when vehicles block each other from moving, such as when a car turns left and crosses a lane of oncoming traffic. The Concord Alewife Plan reports that for the area roughly bounded by the Route 2/Route 16 intersection, the Alewife Brook Parkway, and Concord Avenue, service starts to deteriorate when a roadway reaches the “critical sum” of 1,500 vehicles per hour, or 1,800 vehicles per hour for rotaries. Below those numbers, and most motorists can get through an intersection in two or fewer light cycles. Above those thresholds, you’ll wait at that light a long time. As of 2005, the Concord/Route 2 rotary was already operating at 1,880 critical interactions—80 above the threshold—with a total traffic volume of 4,300 trips per day, while Concord Avenue at Blanchard Road had already reached 1,400 “critical sums” per hour, with 2,460 trips per day.

The report also predicted vehicle trips per day for 2024 for the area after Cambridge’s rezoning (which Cambridge enacted in June 2006.) The permitted 70 Fawcett Street development, which will be located between these two intersections, by itself promises to add enough vehicle trips to reach the predicted 2024 buildout trip level by 2014—and there’s plenty more space for apartments and garages alongside between the Concord Avenue rotary and Blanchard Road.

Also:

Of course, some of these buildings’ residents will take the T to work—if they can fit on the T…The Red Line is already “congested” and running at capacity, according to a June 2012 study by the Urban Land Institute titled Hub and Spoke: Core Transit Congestion and the Future of Transit and Development in Greater Boston.

So, Cambridge publishes a plan for the Alewife area which reports that traffic congestion is already a problem, but then it permits several large housing developments which will worsen it. The Belmont Citizens Forum article does report that design study has been funded for a new bridge over the commuter rail tracks west of Alewife Station, connecting it with Concord Avenue. That will relieve some congestion near the Alewife Brook Parkway/Concord Avenue rotary but will have little effect elsewhere. And this is still only a design study.

As a bicycling advocate and repeated critic of Cambridge’s treatment on Concord Avenue — see summary of my comments here — I have found another major inconsistency with the 2005 Concord-Alewife Plan: the recent reconstruction of Concord Avenue so as to maximize the number of conflicts between bicyclists and motorists. The new traffic signal just west of the Concord Avenue/Alewife Brook Parkway rotary backs up traffic into the rotary whenever a bicyclist or pedestrian actuates the signal to cross. The westbound sidewalk bikeway installed on the north side of Concord Avenue crosses a driveway or street on average once every 100 feet, requiring motorists to stop in the only westbound travel lane, blocking traffic, to yield to bicyclists overtaking on their right. Buses traveling both ways on Concord Avenue must stop in the travel lane, where their doors open directly into the bikeway. The conflicting turn movements between motorists and bicyclists, and bus passengers discharged onto the the bikeway, pose serious safety concerns too.

In previous posts on this blog and elsewhere, I recommended a two-way bikeway on the south side of Concord Avenue next to Fresh Pond Park, where there is only one signalized intersection, and maintenance of the previous roadway width and bike lanes.

The 2005 Concord-Alewife Plan contains no mention of the Concord Avenue bikeway — see recommendations for Concord Avenue on page 80 of the report. The plan therefore does not account for the congestion caused by the bikeway, on which construction began only 4 years later.

The overall impression I get is that Cambridge’s planning is disorganized, but also, Cambridge’s bicycle planning occurs in a fantasyland where the well-known conflict situations which cause crashes are greeted with a claim that the goal is to make bicycling more attractive, then, poof, when there are more bicyclists, by magic, bicycling will become safer. I call this the “Pied Piper” approach to bicycle planning. Well, actually, Cambridge is reporting a steady level of bicycle crashes in spite of an increasing volume of bicycle traffic. Some decrease in risk with increasing volume occurs with any mode of transportation as its users gain longer experience. The issue I have is with using this as an excuse for wishful thinking and crap design, and writing off the victims of preventable crashes as expendable. Cambridge has had some gruesome preventable crashes, and has intersections with the highest volumes of bicycle crashes anywhere in Massachusetts.

Another overall impression which I can’t shake is that Cambridge is very selective about reducing traffic congestion. The Concord Avenue project; the residential developments planned for the Alewife area; the Western Avenue roadway narrowing and sidewalk bikeway; and the proposed bikeways along Binney Street increase congestion at the portals to the city. It all strikes me as rather desperate and underhanded way to decrease congestion in the core of the city, but there you have it, as it appears to me.

[Added paragraphs, October 7, 7:40 AM] Residential development close to the urban core is certainly preferable to sprawling suburbs to minimize environmental impacts and traffic congestion, but resolving the traffic problems in the Alewife area would require major investments to increase Red Line and bus service, and disincentives (read: high cost) for single-occupant motor vehicle travel. The public resists all of these. If there is a logic to the City’s approach to these challenges, it is to break down resistance by making the problems so pressing that the pain becomes intolerable.

Bicycling and walking can make some contribution, but the plans for the new housing developments describe it as small. Quoting again:

To be fair, the developers of these various projects are attempting to make car-free commuting more attractive to their residents. Several of these buildings have extensive bicycle-parking facilities, including the Faces site and 160 Cambridgepark Drive. But the city of Cambridge doesn’t anticipate that those bicycles will get much use. For 398-unit 160 Cambridgepark Drive, for example, the city estimates the residents will make 1,324 daily car trips, and 202 pedestrian trips, but just 98 journeys by bike.

Most of the traffic in the area in any case is to or from more distant locations, or is passing through. Bicycling and walking may serve as feeder modes for these longer trips but don’t compete well with motorized modes to cover the distance.

September 3, 2013

300 Mass. Ave./Forest City project gets final Planning Board approval

Filed under: Cambridge,Central Square,planning — Tags: , , — Robert Winters @ 11:58 pm

Sept 3, 2013 – The Cambridge Planning Board tonight gave its unanimous final approval to the design of the proposed building at 300 Mass. Ave. that had been the subject of multiple iterations of a zoning petition by Forest City/MIT.

300 Mass. Ave. - Proposed Design
300 Mass. Ave. – Proposed Design (June 2013)
300 Mass. Ave. - Approved Design
300 Mass. Ave. – Approved Design (Sept 2013)

This marks the successful final step of what has been a very long process that began with the initial filing in February 2011 of a zoning petition to extend the Cambridgeport Revitalization Development District (CRDD) to include this Mass. Ave. frontage from MIT’s Random Hall up to Blanche Street (commonly referred to as the "All Asia Block"). In a sense, this story really began several decades ago with the original plans for University Park that included this block but which was subsequently excised due to different property ownership. Only in recent years have those other owners been willing to enter into the arrangement that led to the proposal now finally approved and proceeding toward demolition and construction.

The February 2011 zoning petition was eventually withdrawn but was re-filed in March 2012. That zoning petition spawned a backlash when, at the City’s urging, a slender residential tower at Sydney and Green Streets was included in the plans. Amid complaints over excessive shadows and the loss of a small park, the residential component was removed from the proposal in its Ordinance Committee. In a curious twist, many of the same people who objected to the proposed housing morphed into housing activists as they objected to the proposed commercial building. This zoning petition was then allowed to expire in August 2012. It was re-filed in substantially the same form in December 2012 along with a revised memorandum of understanding that reaffirmed a variety of housing commitments and added the promise of new affordable housing units in the future. That zoning amendment eventually passed unanimously in February 2013.

With the new zoning in hand, there was still the design review process required under the zoning. The architects had an initial review before the Central Square Advisory Committee in June followed by the initial Planning Board hearing on July 9. There were some objections from the Board and unresolved issues with an abutter, so another hearing was scheduled for August 6. Rather than get the go-ahead as expected, there were still a few substantial objections remaining – primarily concerning the significant amount of glass on the Mass. Ave. facade, so yet another hearing was scheduled. At the September 3 hearing the architects presented much more aesthetically pleasing plans and the Planning Board gave an enthusiastic and unanimous vote of approval.

In addition to a very good building, the plans include a cooperative plan with the City to transform Blanche Street between Green Street and Mass. Ave. into a "shared street" or woonerf, a Dutch word that means "living street" where pedestrians and cyclists have legal priority over motorists. Two examples of this kind of treatment are Palmer Street and Winthrop Street in Harvard Square. There will also be a significant row of new small-scale retail along the Mass. Ave. frontage.

It has to be noted that, as has happened before in Cambridge, this development proposal left a political vestige – the opposition group that calls itself the Cambridge Residents Alliance (CRA). Their primary activities to date include (1) a zoning proposal that would have preserved in perpetuity the surface parking lots in Central Square and harshly capped all building heights and densities in and around Central Square, (2) a proposed citywide moratorium on most large-scale residential or commercial development, (3) an activist core that presents highly disputable claims of "a tsunami of development" and "crush hour on the Red Line", and (4) the inevitable effort to promote anti-development candidates for City Council in the upcoming election. Another group called "A Better Cambridge" (ABC) was formed that generally supports "smart growth" principles and good urban design but remains apolitical.

The ABC group has been largely supportive of the recommendations that grew out of the 2011-2012 Central Square Advisory Committee and its predecessor Mayor’s Red Ribbon Commission. The CRA has been primarily opposed to any of the recommendations that would permit any substantial new construction or redevelopment in Central Square (and elsewhere in Cambridge). So even as the Forest City/MIT plans for 300 Mass. Ave. proceed toward construction, the seeds have been sown for the latest episode in the never-ending competition of visions for the future of Cambridge and Central Square – just in time for this year’s municipal election season. Indeed, a very good case can be made that the current "Net Zero Petition" (introduced by many of the same activists who have been opposing new construction) is a proxy to stop all new large-scale residential and commercial construction. – Robert Winters

August 18, 2013

A Better Cambridge response to Connolly Net Zero Zoning Petition

Filed under: Cambridge,planning — Tags: , , — Robert Winters @ 6:09 pm

A Better Cambridge response to Connolly Net Zero Zoning Petition

The members of A Better Cambridge thank the proponents of the Connolly Net Zero Petition for provoking such an important discussion about climate change adaptation in Cambridge. The Connolly Petition has challenged our community to take a serious look at how we will eliminate consumption of fossil fuels and promote alternative energy use across the city of Cambridge.

A better Cambridge is a net zero Cambridge. Eliminating carbon emissions should be a primary goal in Cambridge. We believe that a viable approach to serious energy efficiency in Cambridge relies on a multi-pronged strategy that addresses what we require of new development and how we adapt existing buildings, with a focus on multi-modal transportation throughout. A key achievement will be that carbon emissions are reduced within our city through construction of better and more efficient buildings, without at the same time exporting emissions to communities outside of our borders.

While taking this serious and long-overdue look at building efficiency in Cambridge we can’t also lose sight of important community development challenges facing our city. The cost of rent continues to rise in Cambridge, and condos here are being sold for hugely inflated prices. Promoting the development of more mixed residential and commercial buildings around Cambridge’s existing transportation hubs is a key strategy in our ability to make housing more affordable for all people in Cambridge. We have serious concerns that the Connolly Petition’s narrow focus on large scale new development will hurt our ability to create the new affordable low- and middle-income housing that is now so desperately needed to keep Cambridge a diverse and sustainable community.

When it comes to housing, most research and practice-based evidence into the feasibility of cost-effective net zero housing applies to low-density, single-family homes in moderate climates like California. This is not the type of new housing we should expect or hope for in Cambridge, and there is insufficient evidence to make any conclusions about the feasibility of developing net zero multifamily housing here. This places at risk the viability of important projects like housing at the Sullivan Courthouse, for which residents of East Cambridge have been fighting. If the Cambridge Housing Authority development currently planned for Temple Street were subject to the requirements of the Connolly Petition, it almost certainly would not go forward.

In a 2012 study “Think Bigger: Net-Zero Communities” the authors, who represent the Alliance to Save Energy, the Urban Land Institute, and the U.S. Department of Energy, effectively argue that “achieving net-zero energy across an entire building stock requires looking beyond individual buildings and considering net-zero at a community scale.” They state that:

  1. it might not be feasible to achieve net zero energy in every building – this might be more realistic for buildings evaluated together;
  2. Multi-building systems offer opportunities for lower energy use through heat sharing and load diversity; and
  3. drawing a larger perimeter around multiple buildings and adjacent open space allows us to consider “nearby” renewable energy sources thus keeping buildings and urban densities in the net zero mix.

As the study goes on to explain, we need an approach to net-zero that allows for the diversity of building types, uses, and climates and also one that will not dilute urban density in favor of low-rise sprawl. We believe these points are wholly missed in the Connolly Petition’s approach to net zero.

Focusing only on new development, even of substantial square footage, will seriously limit the impact of the Connolly Petition. New construction is small compared to our existing building stock, and anything built after 2010 must comply with Cambridge’s stretch code — energy efficiency standards that are among the toughest in the nation, which have effectively increased the stock of highly energy efficient commercial, residential and institutional buildings in Cambridge without negatively impacting our progress towards key social goods like affordable, multi-family housing.

It would be important to tackle this in a more robust and holistic fashion: require developers to meet “Architecture 2030” goals for new buildings, a program that phases in fossil fuel reductions while, more importantly, targeting our biggest consumers of energy — our existing building stock. For example, this could be accomplished by specifically allocating community benefit funds awarded under new development to support greater energy efficiency conversion subsidies in Cambridge’s existing building stock. Under the Connolly Petition developers could meet net zero requirements by paying for carbon offsets — while missing the opportunity to direct more funding to key community and economic development opportunities.

From a carbon emissions reduction standpoint, Cambridge is a great place to build. Every hundred thousand square feet we add here is a hundred thousand square feet that’s not going up along Routes 128 or 495. Even a net-zero building in a suburban office park is likely to generate a far more negative impact on the climate and the environment than a building in Cambridge that complies with our currently applicable codes and regulations. Suburban construction often involves leveling greenspace and removing acres of carbon-absorbing vegetation. Storm runoff is unlikely to be carried through a separated system, as in much of Cambridge; instead, it is likely to be mixed with sewage, and treated in an emissions-intensive process. Connecting the new structure to roads and utilities generates additional impacts. Workers are far more likely to commute by car, pumping out carbon emissions, and accommodating their vehicles requires additional construction. Of course, no other local town is proposing to require net-zero construction; few even approach Cambridge’s current sustainability standards. The actual choice facing many developers is between meeting Cambridge’s rigorous standards, or taking advantage of the relatively lax rules imposed by most suburban communities. As we work to reduce carbon emissions, it makes sense to keep this broader picture in mind.

Any comprehensive plan to tackle carbon emissions in the Commonwealth would involve incentivizing developers to site their buildings along public transportation networks and proximate to dense residential areas. The Connolly petition, although clearly well-intentioned, seems likely to raise the cost of new development in Cambridge relative to surrounding communities, having the contrary effect. All carbon emissions, whatever their point of origin, have the same impact on our community and our environment. To the extent that this petition moves new construction away from Cambridge, with its high standards on sustainability, and into surrounding areas, it runs a substantial risk of actually raising the very emissions it proposes to contain. We do not believe that this is the outcome the petition seeks, nor do we think it is an outcome that most residents desire.

Focusing on net zero and energy efficiency only neglects the importance of addressing climate change adaptation holistically: in addition to energy efficiency of new buildings and existing buildings, we need to focus on other key climate mitigation strategies such as addressing water resources, resilience planning and mitigation, and innovative and integrated transportation strategies and policies that will effectively move people from their cars into alternative, low- or no-emissions transportation options.

Again, A Better Cambridge thanks the proponents of the Connolly Petition for challenging our community to take this important look at our carbon footprint in Cambridge. Unfortunately, we believe the proposed zoning takes a far too narrow approach that may effectively stall the very type of development we need to actually reduce emissions while addressing key housing/community development needs here in Cambridge.

August 6, 2013

Cambridge Rindge and Latin School Renovation Achieves LEED® Gold Certification

Filed under: Cambridge — Tags: , — Robert Winters @ 6:34 pm

Design provides greater sustainability and improved space utilization

Aug 6, 2013 – The City of Cambridge is proud to announce that the comprehensive renovation project for Cambridge Rindge and Latin School (CRLS) has earned LEED Gold certification from the U.S. Green Building Council. Designed by HMFH Architects, Inc., the highly visible 400,000 square foot high school fulfills the City’s ambitious sustainability goals through substantial reductions in energy consumption and water use, and significant increases in indoor environmental quality, natural ventilation and daylighting.

The sustainable design strategy for the three-building complex, which was originally constructed in 1932 and expanded in 1978, includes a chilled beam HVAC system – well-suited to incorporation in existing concrete frame buildings—and a rooftop photovoltaic array. These retrofits, coupled with high-efficiency lighting fixtures and daylighting contribute to the school’s net energy savings, lowering the operating costs by more than $335,000 annually, and reducing energy use by more than 1.3 million KWh of electricity and nearly 44,000 therms of natural gas.

Monitors in the lobby displaying real-time energy data and a small rooftop garden tie environmental stewardship to the curriculum and provide educational opportunities for the school’s 1,800 students. Other visible features include low-flow fixtures that provide an annual savings of 1.3 million gallons of water, operable windows and outdoor bike racks. Beneath the playground for the onsite daycare center, a rainwater collection tank stores runoff from the roof and is used to irrigate the landscaping, eliminating potable water use.

While achieving high points in the categories of Sustainable Sites, Energy and Atmosphere and Water Efficiency, the project was cited with exemplary performance for construction waste management by diverting 95% of waste from landfills back into the manufacturing process. The revitalization and refresh of classrooms and shared core spaces required careful selection of finishes; recycled and low-VOC materials, FSC-certified wood, and durable rubber flooring that requires no harsh cleaning chemicals, contribute to the overall indoor air quality to provide a healthy learning environment.

The renovated school, which shares its urban site with two other City-owned LEED Silver buildings – War Memorial Recreation Center, also an HMFH design, and the Cambridge Public Library – completes the civic campus of sustainable buildings and aligns with the City’s sustainability initiatives.

CRLS Exterior

"As far as we know, less than 10 renovated school buildings nationwide have achieved LEED Gold, so we are especially proud," said Cambridge City Manager Richard C. Rossi. "This project is a perfect example of what can be achieved with civic commitment and strong community support. It also validates and expands our city-wide efforts to manage all of our resources in the most sustainable way. The revitalization of CRLS represents an ongoing commitment to modernize our educational facilities, to promote the highest levels of learning and achievement for all students, and to reduce our community’s carbon footprint."

CRLS Computer Lab

The City and the CRLS Project Manager worked closely with its architects, utilizing their expertise in both educational environments and sustainable design, to turn this project from a basic reconstruction into a stunning example of how to integrate 21st century learning and environmental responsibility. This effort resulted in improved classrooms, library and teaching facilities, and corridors with new windows, flooring and wall finishes. Additionally, the renovation also enlivens common areas and provides clear circulation and more internal transparency. The re-designed science core includes larger labs that accommodate teaching areas as well as space for experiments, and the theater is redesigned and equipped for live broadcasts.

The City of Cambridge is proud to have worked with HMFH Architects, Inc., a local firm that has been in business since 1969 on two award winning renovated municipal buildings that serve as models for sustainable and healthy community development.

CRLS Panorama - photo by Ed Wonsek
CRLS Panorama – photo by Ed Wonsek
« Newer PostsOlder Posts »

Powered by WordPress